IFB No: NOC/ALPPP/NCB/W/2082/83-02 Construction of Protection Wall (Gabion Works) for Slope Stabilization at NOCL Land near Lothar, Chitwan: Ch:0+000 to 0+260
(Package 1)
IFB No: NOC/ALPPP/NCB/W/2082/83-03 Construction of Protection Wall (Gabion Works) for Slope Stabilization at NOCL Land near Lothar, Chitwan: Ch:0+260 to 0+520
(Package 2)
IFB No: NOC/ALPPP/NCB/W/2082/83-04 Construction of Protection Wall (Gabion Works) for Slope Stabilization at NOCL Land near Lothar, Chitwan: Ch:0+520 to 0+780
(Package 3)
IFB No: 05-RDDOT/2082/083-19 Reactive/Recurrent Maintenance Work of NH66 (Budar-Syaule) and NH03 (Chaukhutte-Silgadhi, Silgadhi-Syaule and Syaule-Anarkholi)
IFB No: DMC/BAGLUNG/NCB/WORKS/082/83-02 This Project covers the continuation of the building construction project as part of Phase II. The works included in this phase are as follows:
Structural Works
"(i)RCC frame structure (columns, beams, slab) Including Underground Water Tank Semi Structure .
(ii) Masonry works (Brick wall ). Bricks for Staircase Wall Structure Below Ground Level/ Ground Level
Miscellaneous Works
(i) Site preparation with back filling around Building and minor external works as included in this estimate.