Works:
IFB NO : SPRM/NCB/DOP/ WORKS/2081- 082-06 || Nisal Dekhi She Gumba Samma
Paryatan Sadak Nirman 38,53,048.91
IFB NO : SPRM/NCB/DOP/ WORKS/2081- 082-07 || Syungchher Gaun Sichai Kulo Nirman
42,81,421.28
Works:
IFB NO : Rmun/NCB/Works/08/2081/82 || Blacktop of Itahara Bajar Purba Katnu Jane sadak
Works:
IFB NO : PRM/ILAM/WORK/NCB/02/081/082 ||,Construction Of Veterinary Hospital Building
Works:
IFB NO : FRM/Sindhuli/Works/ NCB/05/081-82 || Jhagare Lift Sichai Tatha Nadi
Niyantran Phikkal - 05 (19,325,196.82)
Works:
IFB NO : NCB/BRM/WORKS/003/2081-82 || Upgrading of rural road
Works:
IFB NO : BRM/081/82/WORKS/05 || Chyamrangbesi Ratankhola Jhinge Sukumphedi Chyangchyang Khola Road
Works:
IFB NO : UGR/NCB/MAN- 01/081-82 || Upgrading works of Pratapur 10m Road at Wardno. 6 (1,60,19,704.33)
IFB NO : UGR/NCB/MAN- 02/081-82 || Upgrading of Road Ward no. 4 Twangra Bankariya to Jyamire Dobhan (1,95,57,055.12)
Works:
IFB NO : (MBAHS/HH/MI/2081/082-004) || Procurement of Medicine Items for Hospital Pharmacy, MBAHS, Hetauda Hospital
IFB NO : (MBAHSHH/C1/2081/082-005) || Procurement of Cleaning Items for MBAHS Hetauda Hospital
Works:
IFB NO : 134/64/081-82 || Upgrading of Work
Works:
IFB NO : KLGDWNCB/BIP 04/081/82 || Construction of Barichaur Irrigation Project (Second Package) 41,81,797.40
Works:
IFB NO : BGM/REVENUE/ GOODS/1/081-082 || Collection of Local Revenue Tax at Nuwakot
Works:
IFB NO : BRM/081/82/WORKS/05 || Chyamrangbesi Ratankhola Jhinge Sukumphedi Chyangchyang Khola Road
Works:
IFB NO : KRM/NCB/Works/Dolakha/03/2081/82 || Upgrading of Bhatere chaur,pokhari chaur, loteping sadak dhalan Section 1) thulo khola thulo sim causeway dhalan Section 02) chire khola gabion wall tatha marmat,Thumka pipalbot gabion wall nirman Section 03)
Works:
IFB NO : MBAHS/HH/CMGPS/NCB/2081/082- 001 || Supply and Delivery of Central Medical Gas Pipeline System at Makwanpur
Works:
IFB NO : 134/64/081-82 || Upgrading of Work
Works:
IFB NO : WSWRIDDO/Myagdi/ G/NCB-01/081/82 || Supply and Delivery of PE 100 HDPE Pipes for Myagdi District. (NRS) 71,54,520.00
IFB NO : WSWRIDDO/Myagdi/ G/NCB-02/081/82 || Supply and Delivery of GI Pipe, Fittings and Tools for Myagdi District. 33,15,646.00
Works:
IFB NO : NCB/SRM/06/081-82 || Construction Of Black Topped Road From Bangai-Rajad-Pakadi,ward 5
Works:
IFB NO : IFB/04b/UDB-RUP/081-82 || Construction Work of Road From Dubauli-Pokharabari to Belbas Bethari Sadak at Butwal-18,Rupandehi
Works:
IFB NO : IFB/04b/UDB-RUP/081-82 || Construction Work of Road From Dubauli-Pokharabari to Belbas Bethari Sadak at Butwal-18,Rupandehi
Works:
IFB NO : IFB/04b/UDB-RUP/081-82 || Construction Work of Road From Dubauli-Pokharabari to Belbas Bethari Sadak at Butwal-18,Rupandehi
Works:
IFB NO : 01/081-82/Goods/WSSDOBaglung || Supply and Delivery of HDPE Pipes PE-100 NS40:2022 (Revised) for Baglung District. NRS. 1,20,41,304.00
IFB NO : 02/081-82/Goods/WSSDOBaglung || Supply and Delivery of HDPE Pipes PE-100 NS40:2022 (Revised) for Parbat District. NRS. 81,71,269.20
Works:
IFB NO : BRM/081/82/WORKS/04 || Tipchowk Parthali Road
Works:
IFB NO : KRM/NCB/Works/Dolakha/02/2081/82 || Upgrading of Campus dhamire sadak(section 1) ,Ghangkhola Ganeshmandir Tilahar Sadak(Section2) ,Chakarpu Malepu Krishi Sadak(section3) ,Dhamire Sakhalpu sadak(section4) , Pipalbot Krishi Sadak(section5) ,Pipalbot Jalkini Sadak(section6) ,Makaibari Sadak(section 07) ,Malepu Sadak(section 08 )and Mildanda Odakarlaya Kalinag Mavi Sadak (section 09)
Works:
IFB NO : MADI/NCB/W/2081/82-01 || Construction of Mad Madhyamik Bidhyalaya
68,88,069.36
Works:
IFB NO : 134/63/081-82 || Upgrading of Work
Works:
IFB NO : NCB/SRM/05/081-82 || Construction Of Black Topped Road from Manpakadi-Kunwari-babhani danda,Shuddodhan 5
Works:
IFB NO : GDRP/337011014/081/82-01Maintenance of black top road with structural works at road section from Ch. 0+000 to 0+944 (Gaighat Bazaar) and road section from Ch. 16+200 to 20+000 along Gaighat Diktel Road, Udayapur
Works:
IFB NO : NCB/BRM/WORKS/004/2081-82 || RCC frame structure Building
Works:
IFB NO : IFB/04g/UDB-RUP/081-82 || Construction of road ,drain slab and kerb stone at bardahawa village,Kapilbastu-02,Kapilvastul
Works:
IFB NO : OIRM/GUL/NCB/081/82-08 || Providing and laying granular sub-base on prepared surface, mixing at OMC, and compacting to achieve the desired density.
Works:
IFB NO : NCB/SRM/04/081-82 || Construction of Blacktopped Road From sisaughari -Butwal Sub. Metropolitan city Border,ward 2
Works:
Seeds at Lalitpur
Works:
IFB NO : KRM/NCB/Works/Dolakha/01/2081/082 || Upgrading of Gumukhola -Syaule -Pokhare -Bhadaure- Kattike Sadak,Ward no 07
Works:
Consulting For Vulnerability & Safety Assessment of Roof & Civil structure of VIP & General parapets of Dahrath stadium at Tripureshwor, Kathmandu
Works:
IFB NO : BAR/NCB/Works/06/081/82 || Bardaghat Nagarpalika Bhawan Marmat, Rangarogan tatha Canteen Nirman, Bardaghat-04
Works:
IFB NO : RMUN/NCB/Works/06/2081/82 || Two, Three and four phase line
Works:
IFB NO : 01-081/082/NCB/DOARDOTI || Road Construction Of Work Includes Stone Soling, PCC & Earth Work
Works:
IFB NO : NCB/SRM/03/081-82 || Construction of Black Topped Road From Khungawa -Madhuwani to BUdhha circuit road ,phase II ,Shuddodhan 7
Works:
IFB NO : PUDBC/CHITWAN/NCB/ WORKS/12/081/082 || Upgradation of Road from
bharatpur 11,Bishal Chowk to Shaktikhor 1,29,33,288.12
IFB NO : PUDBC/CHITWAN/NCB/ WORKS/13/081/082 || Upgradation of Road from Gaighat - Kamalpur, Bharatpur -29, Chitwan 84,82,349.79
IFB NO : PUDBC/CHITWAN/NCB/ WORKS/14/081/082 || Upgradation of Road from Kurintar-Naya Basti-Dadabari-Beldanda-Lamidada 84,85,916.72
IFB NO : PUDBC/CHITWAN/NCB/ WORKS/15/081/082 || Beautification and construction of Kerunga drain corridor at Bharatpur Metropolitan city.
IFB NO : PUDBC/CHITWAN/NCB/ WORKS/16/081/082 || Upgradation of Road with drain from prembasti school chowk to shiva shrestha's house at Bharatpur Metropolitan city-07, Chitwan.
Works:
IFB NO : IFB/04a/UDB-RUP/081-82 || Construction Work of Road and Drain at Dubauli Chowk(Belbas-Bethari Road) to West Way to Suddhodan,Butwal-18,Rupandehi
Works:
FB NO : PSMUN/NCB/WORKS/2081/082-03 || Buddha Marga Kalopatre Sadak Nirman 2081/82
Works:
IFB NO : NCB/SRM/02/081-82 || Construction of Black Topped Road From Parauta Gaun to Parauta Bhata ,shuddodhan 1
Works:
IFB NO : NCB/SRM/01/081-82 || construction of ward & health post building,shuddodhan 6
Works:
IFB NO : BRM/081/82/WORKS/03 || Bhanjyang Golgaun BHugdeu Medamshu Road
Works:
IFB NO : 134/68/081-82 || Upgrading of Work
Works:
IFB NO : SKPCH/NCB/WORKS/08/081/082 ||(15 Bed Building Construction Works)
IFB NO : SKPCH/NCB/WORKS/07/081/082 || (Construction Work of Steel Structure for Pharmacy and Laboratory at Sushil 168000.00 3,000.00 Koirala Prakhar Cancer Hospital)
IFB NO : SKPCH/NCB/WORKS/09/081/082 || (Canteen Building Construction Works)
© Copyright Thekkabazar. All Rights Reserved