Works:
IFB NO : SGNHC/ICB/081/82/32 || Supply And Delivery Of IABP Balloon Catheter
Works:
IFB NO : TH/Kailali/ICB/Goods/01/2081-082 || he Procurement of Supply, Delivery and Installation of CT Scan Machine 64 Slice.
Works:
IFB NO : SGNHC/ICB/081/82/30 || Supply And Delivery Of Oxygenators And Hemoconcentrators
Works:
IFB NO : SGNHC/ICB/081/82/30 || Supply And Delivery Of Oxygenators And Hemoconcentrators
Works:
IFB NO : SGNHC/ICB/081/82/29 || Supply And Delivery Of Custom Tubing Packs And Myocardial Protection System
Works:
IFB NO ; DROBKT/08/081/082/50 || Structural works in sanga Suryamod Kakrabari Road.
Works:
IFB NO : DROBKT/08/081/082/49 || Structural works in Ghatekhola Corridor
Works:
IFB NO : DROBKT/08/081/082/48 ||Recurrent maintenance works at Kausaltar – balkot -Sirutar – biruwa (F091), trolly bus (ARM) Suryabinayak – Chamelidanda Road (F099) and Srijana chowk (ARM) DRO Katunje Road.
Works:
IFB NO ; DROBKT/08/081/082/47 || Structure works at Jitpur Charali- Kalamasi -Nagarkot Road.
Works:
IFB NO : DHM/MFD/C/EOI/04-2081/82 || The main objective of the consulting work is to assess the existing system and fix the issues related to the ICT infrastructure to enhance its operational efficiency in the Aviation Weather Service at MFD.
Works:
IFB NO : 03/GRM/SQ/W/081/82 || construction of drain
Works:
IFB NO : DROBKT/08/081/082/46 || Road Traffic Saftey on Sallaghari durbar square road & Sallaghari Byasi Changunarayan road
Works:
IFB NO : 30/BM/BDG/2081/82 || Construction at Sarpodansh Upachar Kendra and laying Block work
Works:
IFB NO : NITDB/NCB/SQ-01(2081/082) || Supply and Installation of National Flag In Nepalgunj ICP
Works:
IFB NO : DROBKT/08/081/082/45 || Recurrent maintenance works at Gathaghar Thimi, Sinamangal Manohara Thimi Sallaghari , Thimi Bode Karki Gaun & Sallaghari – duwakot – Changunarayan – phedigaun Road
Works:
IFB NO : VTC-CS-CSB-081/082-7 || Cutting and Stitching (Basic)
Works:
IFB NO : DROBKT/08/081/082/44 || Recurrent maintenance works at Jagati -chyamasing -Kamalbinayak & Kamalbinayak- sudal – Adhikari Gaun-Nagarkot Road
Works:
IFB NO : VTC-CS-PLB-081/082-6 || Plumbing-Basic
Works:
IFB NO ; VTC-CS-MOM-081/082-5 || Motorcycle Mechanics
Works:
IFB NO : VTC-CS-BNB-081/082-4 || Beautician -Basic
Works:
IFB NO : PRM/ROL/W/RO/SQ/5/2081-082 ||
Works:
IFB NO : KIMO/WORKS/SQ-05/2081/082 || Repair and Maintenance of Main Canal At Reach I of KIS, Jhapa At Different Chainages of Reach I of KIS, Jhapa (D/S of Satashi Syphone)
Works:
IFB NO : KIMO/WORKS/SQ-01/2081/082 || RCC Canal Lining Works At Secondary Canal ( S-10 and S-11 ) Of KIS Jhapa at Different Chainage of S-10 and S-11 ,Secondary Canal of KIS Jhapa
Works:
IFB NO : PRM/ROL/W/RO/SQ/4/2081-082 ||
Works:
IFB NO : 06/RIDOKAP/081-82/88. || Road Upgradation Works
Works:
IFB NO : DoLID/RRBS/EOI-03/2081-2082 || Consulting service for motorable bridge design and construction
Works:
IFB NO : 06/RIDOKAP/081-82/110 || Road Upgradation Works
Works:
IFB NO ; DROBKT/08/081/082/42 || Traffic safety works along Manoharapul -sallaghari – suryabinayak - sanga section of Arniko highway (NH34)
Works:
IFB NO : DROBKT/08/081/082/42 || Traffic safety works along Manoharapul -sallaghari – suryabinayak - sanga section of Arniko highway (NH34)
Works:
IFB NO : FRM/Sindhuli/Goods/SQ/04/081-82 || Procurement of Gabion Box.
Works:
IFB NO : 05/BMO/G/2081/082 || Nadijanya padaartha uthkhanan, sankalan tatha bikri(dhungrahi ghat)
Works:
IFB NO ; BPKIHS/081/082/43 || Furtnuture Set up for Pharmacy Building
Works:
IFB NO ; MIMO/TMBJSP/Kailali-1/NCB-02/081/082 || Deep Tube Well Drilling, Pump Test, Pump Installment, Pump house construction, Electrification work and pipe distribution system development in Bardagoria-5, Lamki-1,3&4 in Kailali District (Kailali North).
Works:
IFB NO : 06/BMO/G/2081/082 || Nadijanya padaartha uthkhanan, sankalan tatha bikri(chandanpur ghat)
Works:
IFB NO ; 02/BMO/G/2081/082 || Nadijanya padaartha uthkhanan, sankalan tatha bikri(bairiyaghat)
Works:
IFB NO : NFRC/SQ/Goods/01-2081/82 || Procurement of Spray Dryer - Set 1
Works:
IFB NO : ITR/SQ/10G/081/082 || Supply and delivery of Veterinary medicines and medical items, Itahari, Sunsari
Works:
IFB NO : DHM/HD/C/EOI/01-2081/82 || Integration of Open Source Hydrological Forecasts in Common Web Portal
Works:
IFB NO ; SQ-05/2081-082 || Construction of Ghaat at Danda Khola, Jagat Guru Peeth Aashram, Omsatiya 4, Rupandehi
Works:
IFB NO : SQ-04/2081-082 || Construction of Canal and Canal Structures at Betahani IP, Suddodhan 3, Rupandehi
Works:
IFB NO : SQ-04/2081-082 || Construction of Canal and Canal Structures at Betahani IP, Suddodhan 3, Rupandehi
Works:
IFB NO ; SQ-02/2081-082 || Construction of Canal and Canal Structures at Aadarsha Tole IP, Devdaha 5 & at Pakadi Piparaiya Sinchai , Devdaha 8,Rupandehi.
Works:
IFB NO : NEA-DDC-LineShifting-2081/82-03SQ || 11 kV Composite Line Shifting work from Budhikhola Bridge to former Duhabi Shopping Center due to ongoing Road Extension work (Chainage Km:18+125 to Chainage Km: 20+000) of Department of Roads, Project Office, Itahari, DoR .
Works:
IFB NO : SNNP/WORKS/SQ/01/2081-82 || Tourist Foottrail at Panimuhan, Shivapuri Nagarjun National Park
Works:
IFB NO ; IDOKASKI/W/R/SQ/309/2081-082 || Construction / Upgradation of Musurodhad Talbesi Simkhet Sadak, Rupa 7, Kaski
Works:
IFB NO : NEA/KDC/2081/082/ESQ-03 || Supply & Delivery of Stationery Materials at the store of Kavre Dcs.
Works:
IFB NO ; IDOKASKI/W/R/SQ/619/2081-082 || Saurya Begnas Sadak, Pokhara 28 and 31, Kaski
Works:
IFB NO : NPJDC-2081/082-SQ-03 || Distribution line lt Conductor upgrading work at different location of Nepalgunj DC
Works:
IFB NO : NPJDC-2081/082-SQ-04 || Supply & Delivery work of electrical line materials & electrical tools
Works:
IFB NO : NPJDC-2081/082-SQ-04 || Supply & Delivery work of electrical line materials & electrical tools
© Copyright Thekkabazar. All Rights Reserved