Works:
IFB No : Lidpo/Lumbini/NCB/W/R/081_082/46 || Upgrading of road connecting Baideli-Kopawa,Deuwapar-Hathausa-Barwa-Sonapur to Rupandehi District,Kapilvastu
Works:
IFB NO : Lidpo/Lumbini/NCB/W/R/081_082/45 || Upgrading of Strategic Road Connecting East-West Highway Lakhanchowk Bankatti,Bherleya, Bhusudi, Lawani Siwalba Taranagar Shreenagar Connecting upto Boarderof India,Kpilvastu
Works:
IFB NO : GRMW/NCB/WORKS/04/2081-82 || Road Construction Work
Works:
IFB NO : DSNP/IR/01/081/082 || Mining, Collection and Sale of River Materials (Stone, Gravel & Sand)
Works:
IFB NO : BH/03/2081/82 || procurement of surgical items
Works:
IFB NO : GRMW/NCB/WORKS/03/2081-82 || Road Construction Work
Works:
IFB NO : DOA/NCB-08/PDRF-081/82 || Reconstruction Work Of Bhandarkhal Police House , Bhaktapur Durbar Square
Works:
IFB NO : GRMW/NCB/WORKS/02/2081-82 || Road Construction Work
Works:
IFB NO : DOA/NCB-07/PDRF-081/82 || Conservation work of Barahi Pith Sanyan Ashram and Sattal , Barahi Pith Bhaktapur
Works:
IFB NO : SRM/NCB/WORKS/081-082/01 || Kaldhunga-Thanapati-Chaiju Hundai Gurung Gaun-Naya Gaun Sadak Staronnati
Works:
IFB NO : RAT/CHITWAN/goods/NCB/14/2081-82 || Supply of ultra thin Sanitary Pad.
Works:
IFB NO : 1/DAC/BLDG/081/82 || Campus Building Construction Project
Works:
IFB NO : 01-PPMU/PLRIP/081-82 || The Manharpur (Sahid Marg) - Hanspur - Kharyani - Simrari Road passes through Janakpur Sub-metropolitan city, Hansapur Municipality and Sabaila Municipality of Dhanusha District and assists in connecting wards of Sub-metropolitan city and municipalities with each other of Dhanusha District. The road starts from Manharpur of Ward 17 of Janakpur SMC and ends at Simrari of Ward no 10 of Sabaila Municipality . The road connects Janakpurdham SMC-17, Hansapur Muncipality-1, 2, 3, 5, 7 & Sabaila Municipality-10. The road passes through different settlements like Manharpur, Baghchaura, Belahi, Suganikas, Nauwakhor Prashahi, Khariyani, and Simrari. Total length of the proposed road is 16.35 km. Total formation width of the proposed road will be 8.50 m (without drain), carriage way width of 5.5 m and shoulder width 1.50 m on both sides and side drain of 1 m on either side in settlement area.
Works:
IFB NO : 03/KRM/ROAD/2081/082 || Construction of Asphalt Concrete Road In Gurung Tole ( Chainage 0+890 to 1+397)
Works:
IFB NO : 03/KRM/ROAD/2081/082 || Construction of Asphalt Concrete Road In Gurung Tole ( Chainage 0+890 to 1+397)
Works:
IFB NO : ORRM-W-NCB-19-081/82 || Krishi Upaj Sankalan Kendra Nirman/Sudhar (Ward No: 4)
Works:
IFB NO ; DOA/NCB-06/PDRF-081/82 || Reconstruction work of Narsingha Math, Khopasi, Kavre
Works:
IFB NO : 02/KRM/ROAD/2081/082 || Construction of Blacktopped Road South to Eakta Chock, ward no 4.
Works:
IFB NO : ORRM-W-NCB-18-081/82 || Adhuro Vayarthan Mandir Samrakshan Ra Gnawa Durga Mandir Akikrit Bikash Yojana Ruru 4 Gulmi
Works:
IFB NO : DOA/NCB-03/PDRF-081/82 || Conservation work of Argha Durbar sattal ,Sandhikharka Municipality - 09 , Argha, Arghakhachi
Works:
IFB NO : GRMW/NCB/WORKS/01/2081-82 || Road Construction Work
Works:
IFB NO : 01/KRM/ROAD/2081/082 || Construction of Blacktopped Road on Pathivara Marg, ward no 5.
Works:
IFB NO : MRM/NCB/W/ROAD/2081/082-02 || B.P Marga Road Upgradation
Works:
IFB NO : ORRM-W-NCB-15-081/82 || Adhuro Swargiya Gyanhari Park Nirman Rururkshetra -2 , Gulmi
Works:
IFB NO : DOA/NCB-05/PDRF-081/82 || Reconstruction work of Jaggannath Mandir near Khauma gate ,Durbar Square, Bhaktapur
Works:
IFB NO : KRM/Works/NCB-04/2081-082 || Truss and CGI sheet etc.
Works:
IFB NO ; ORRM-W-NCB-17-081/82 || Upallo Kulo Paga Sichaai Yojana Rurukshetra-5, Gulmi
Works:
IFB NO : KRM/Works/NCB-03/2081-082 || RCC Slab. Toilet, Truss, CGI Sheet, Non Glazed Tile, Glazed Tile, Aluminium Door and Window, gypsum board ,Prefab Panel etc.
Works:
IFB NO : CSH/NCB/IR/03/2081/82 || Procurement of OT OPD Items
Works:
IFB NO : BRM/BCW/NCB/08/2081/082 || Construction of Janata Basic School Building Bhagawatimai Rural Municipality-07,Badabhairav Dailekh
Works:
IFB NO : NEA/SDC/081/082/TLM-02 || Supply and Delivery of Line Materials and Electrical Goods.
Works:
IFB NO : BRM/2081/82Goods/NCB-01 || Procurement of Medicine and surgical items for Beldandi Rural Municipality,Beldandi Kanchanpur.
Works:
IFB NO : ORRM-W-NCB-14-081/82 || Reconstruction and conservation Of Historical Shiwalaya Temple of Rurukshetra-4,Musidanda,Gulmi
Works:
IFB NO ; SHS/G/NCB/1/2081/82 || The Procurement of Medicine Items
Works:
IFB NO : ORRM-W-NCB-13-081/82 || Atihashik Dharmik Kshetra Rurukshetra Purwadhar Nirman ward no 1,Gulmi
Works:
IFB NO ; 01/2081/082/Works/Vet-Lab/Dhangadhi || Construction of Conference Hall on First Floor for Veterinary Laboratory
Works:
IFB NO : ORRM-W-NCB-12-081/82 || Construction of Shree Janabodh Secondary School.
Works:
IFB NO : MRM/NCB/W/ROAD/2081/082-01 || Deumai Fakfok Dovan Deurali Hulak Road Upgradation
Works:
IFB NO : DOA/NCB-01/PDRF-081/82 || Conservation Work of Lamjung Durbar and Kalika Mandir, Gausahar,Lamjung.
Works:
IFB NO : BRM/RCW/NCB/04/2081/082 || Babiyatada- Hepo- Ward office Road Upgrading work
Works:
IFB NO : KSC/UGC/NCB/W/O1/081/082 || Construction of Lab Block (Structural Work up to 1st Slab)
Works:
IFB NO : BRM/WSW/NCB/03/2081/082 || Sahade Jugepani- Paharapani Manghar Water supply Project Constuction Work
Works:
IFB NO : 10/KRM/KAMALPOKHARI/2081/082 || Construction of Kamalpokhari Tourism Area, ward no 1.
Works:
IFB NO : SRM/WORKS/ROAD/NCB/81/82-03 || Bituminous premix work, Rigid pavement works, Plum works
Works:
IFB NO : 09/KRM/ROAD/2081/082 || Construction of Blacktopped Road on Sita chock-Naulo chock-Dada Gaun Road ward no 7.
Works:
IFB NO : ORRM-W-NCB-07-081/82 || Adhuro Thadabata Krishi Sadak Starunnati Rurukshetra 1
Works:
IFB NO : 07/KRM/ROAD/2081/082 || Construction of Blacktopped Road on Tukre, ward no 5.
Works:
IFB NO : MoEST/CLPIU/WORKS/2081-082/03. || CONSTRUCTION OF SCHOOL BUILDINGS IN 8 SCHOOLS OF RAUTAHAT, DHANUSHA, MAHOTTARI, PARSA & SARLAHI DISTRICTS (SCHOOLS WITH 2000+ STUDENTS)
Works:
IFB NO : MoEST/CLPIU/WORKS/2081-082/03 || CONSTRUCTION OF SCHOOL BUILDINGS IN 4 SCHOOLS OF JHAPA,MORANG & SUNSARI (SCHOOLS WITH 2000+ STUDENTS)
Works:
IFB NO : DOA/NCB-04/PDRF-081/82 || Reconstruction Work of Taleju Temple And Dyo chein ,Ipatole,Sankhu
© Copyright Thekkabazar. All Rights Reserved