Works:
IFB NO : PH/Karnali/NCB-02/081-82 || Procurement of Video Endoscopy Machine
Works:
IFB NO : PH/Karnali/NCB-01/081-82 || Procurement of Hospital Liquid Waste Treatment Plant.
Works:
IFB No : RDLTP-02/081/82-11 || Road Upgrading and Improvement Works on Hetauda-Bagmati-Tikabhairab -Bhaisepati-Ekantkuna(Chhampi Tikabhairab)NH37 Road, Lalitpur
Works:
IFB NO : 01/BPKPOSMDB/081/082 || Construction Of Compound Wall
Works:
IFB NO : SMO/80-81/48 || For Bid security 5% of accepted bid price
Works:
IFB No : RDLTP-02/081/82-9 || Road Upgarding Works along Guwarko - Lubhu - Lakurivanjyang Manedovan Road, Lalitpur
Works:
IFB NO : OIRM/GUL/NCB/081/82-06 || Construction Of Road
Works:
IFB No : RDLTP-02/081/82-13 || Road Upgrading Works on Dukuchhap Buspark to Nagarkoti Gau,Lalitpur
Works:
IFB NO : TSMC/NCB/08/W/2081/082 || Nawalpur Prigaun Road Black Topped Work ward no 11
Works:
IFB NO : OIRM/GUL/NCB/081/82-05 || Construction of Different Types of Truss ,Wall ,Raling & Boundry Works
Works:
IFB NO : GRM/RCH/IR/NCB/01/2081/082 || Collection of Internal Revenue Fee for Sales of Mining Stone Excavation, gravel, aggregates, Stone, Soil, Dust etc.
Works:
IFB No : RDLTP-02/081/82-12 || Road Upgrading Works on Nagarkoti Gau to Tikabairab-Kantilokpath sadak, Lalitpur
Works:
IFB NO : RAT/CHITWAN/works/NCB/9/2081-82 || Construction of foothpath,drilling of tubewell with DTH method and other civil works at ward 1,2,3,12,13 & 14(Subbachowk to Dumre chowk/Panchakanya school -Salghari /Swastha chowki road).
Works:
IFB NO : NCB/BNP/GW/081_082/02 || The Procurement of Stationery and Masalanda Goods
Works:
IFB No : RDLTP-02/081/82-8 || Upgrading and Rehabilitation Works of Lele Bazar -Lalitghumti Road
Works:
IFB No : RDLTP-02/081/82-6 || Periodic Maintenance of Pulchowk-Hariharbhawan, Sanepa-Kalopul and Sundarighati-Dhobighat Road, Lalitpur
Works:
IFB No : BRM/NCB/WORKS/05-2081/082 || Construction Of Rcc Drain works From PuspaNagar bichLine Dekhi ShaktiNagar Pani tank Jodne Bato Baijanath-08,Construction of Rcc Drain Work and Road Upgrading Work From Gadarahi 2 no Chowk Dekhi 28 ghar Hudai Lalpur khel Maidan Jodne bato baijnath-06and Road upgrading Work from Phattapur Puranogau Uttar Hudai Dachin Bishambar tharu Ko ghar Samma ,Baijanath-08,Banke
Works:
IFB No : BRM/NCB/WORKS/04-2081/082 || Construction Of Hot Mix Asphalt Concrete(HMAC) Road From Gadarahi 1 no Chowk dekhi Rampur Palika Hudai Gunapur Samma (Parts 4th),Baijanath-05 and 02,Banke
Works:
IFB No : BRM/NCB/WORKS/03-2081/082 || Construction of Blacktopped Road From Baijanath-04 Dhakal Chowk hudai Kohalpur -02 KrishnaNagar ,Simal Tole Trivini Siddharth Tole Samma Baijanath-04, Road Work
Works:
IFB NO : KAHS/NCB/MAINT/01/081/082 || Procurement of Maintenance Materials
Works:
IFB No : BRM/NCB/WORKS/02-2081/082 || Construction Of Hot Mix Asphalt Concrete(HMAC) Road From Bankhet Mansakhu Tharu ko Ghar Hudai Chetriya Karagar Jodne Bato,Baijanath-03,Bankhet Banke
Works:
IFB No : BRM/NCB/WORKS/01-2081/082 || Construction of Blacktopped Road From Ranta Rajmarg Dekhi Janajagaran Aa.vi Jane Bato Baijanath-01,Rata rajmarg Dekhi Dahit Aa.vi Jodne Baijanath-01 ,BhagiRam Tharu ko Ghar dekhi Naulapur Gau Hudai Shiva Mandir Samma Baijanath-04 and New City Najar dekhi Machergau Jane Bato Baijanath-05,Banke Road Work
Works:
IFB NO : ACRM/NCB/GOODS/02/081/82 || Procurement of 4WD vehicle
Works:
IFB No ; GMUN/GOODS/05/081/082 || Extraction of Natural Riverbed Materials(Gravel,Sand,Aggregate,Earth Filling & Stone etc) of Doda River & jhigejhala River
Works:
IFB NO : NEA-KL1-2080/081-MST-03-RE || Supply and Delivery of Thrust Bearing Pads and Guide Bearing Pads at KL1HPS
Works:
IFB NO : LIDPO/Lumbini/EOI/RfP-BR/2081_82/14 || Detail Engineering Survey, Soil Investigation, Detail Design and Report Preparation of the Bridges of Package 2
Works:
IFB No : RIDO-ARG-W-NCB-16-2081/082 || Dadakateri Kodale Wadachaur Motorbato Malarani 2-4 / RIDO-ARG-W-NCB-16-2081/082
Works:
IFB NO : Lidpo/Lumbini/EOI/RfP-BR/2081_82/13 || Detail Engineering Survey, Soil Investigation, Detail Design and Report Preparation of the Bridges of Package 1
Works:
IFB NO : GPO/2081/82-01 || Transportation of Various Electrical Goods Between Different Stores of NEA
Works:
IFB No : RIDO-ARG-W-NCB-15-2081/082 || Dadakateri Aamele Motorbato Staruanneti Malarani -2/ RIDO-ARG-W-NCB-15-2081/082
Works:
IFB NO : NCB/MMO/01/2081-82 || Construction of Black Top Road , Rigid Pavement Road & Cross drainage Structure.
Works:
IFB NO : ACRM/NCB/GOODS/01/081/82 || Supply, Delivery and Installation of furniture items and fixtures for Room to Read
Works:
IFB No ; RIDO-ARG-W-NCB-14-2081/082 || Budhichaur Subarnakhal Neta Motorbato / RIDO-ARG-W-NCB-14-2081/082
Works:
IFB NO : ACRM/NCB/W/CMPD/05/081/82 || Compound Works at Administrative Building
Works:
IFB NO : ACRM/NCB/W/RD/04/081/82 || Upgrading of Arjunchaupari-Simalchaur-Musurbari-Darau Road
Works:
IFB No : RIDO-ARG-W-NCB-24-2081/082 || Upgrading of Deurali Sthith Kutikachaur Nayara Kadakarukh Motorbato Arghakhanchi Chttradev-08
Works:
IFB NO : ACRM/NCB/W/RD/02/081/82 || Upgrading of Arjunchaupari-Lamdanda Road
Works:
IFB NO : DM/NCB/WORK/2081/082-01 || Construction of Asphalt concrete road at Duhabi Municipality ward 8 and 9, Kadamgachi chowk, Raingau, Chatabeli Tharu tole.
Works:
IFB NO : ACRM/NCB/W/RD/03/081/082 || Upgrading of Arjunchaupari-Rapakot-Taalpokhari Road
Works:
IFB NO : ACRM/NCB/W/RD/01/081/82 || Arjunchaupari Approach Road
Works:
IFB No : BGM/NCB/GOODS/2081/082-01 || Supply and Delivery Of medicine and surgical items
Works:
IFB NO : NEA-KL1-2080/081-MST-04-RE || Supply, Delivery, Installation, Testing and Commissioning of Vertical Turbine Pump (VT Pump) at KL1HPS
Works:
IFB NO : 3/CJRMUN/NCB081/082 || To construction of Sindhuwa Chaparichok Yagyadanda Sadak Starronnati ward No 5 & 6
Works:
IFB NO : OAGN/GOODS/01/081/082 || Bus rent service
Works:
IFB NO : DMO/NCB/WORKS/2081/82/01 || Construction of Sanjibani School Museum (Phase II) frame is already built so finishing work is done in this phase
Works:
IFB NO : DMO/NCB/1S2E/WORKS/2081/82/03 || expansion of road track in some sections, construction of retaining structures, Drainage Structures, Preparation of Subgrade, sub-base and base Course and construction of bituminous concrete road including cement concrete pavement construction in some sections.
Works:
IFB No : DM/NCB/Work/2081/082-02 || Construction of Asphalt Concrete road at Duhabi Municipality ward 8, Sonapur Chowk South of Bishnu Ma.Bi. Duhabi-Madheli Road.
Works:
IFB NO : NITDB/NCB/C-53(2081/082) || Boundary Wall Protection Work, Toilet Construction, Wooden Barrier and RCC Pole Installation along ROW in Biratnagar ICP
Works:
IFB NO : NCB-SH-02-081/082 || Supply and delivery of LAB Chemicals for Fully Biochemistry Analyzer(Becon, corolyzer), Hematology Analayzer(Himax, Tulip), Fine care (Agape), Protein Analyzer Mispa I2 (Agape), Mispa Clog(Agape), CLIA Auto Bio throughout fiscal year 2081-082
Works:
IFB No : RIDO-ARG-W-NCB-13-2081/082 || Milanchowk Tharpaila Raikhannne Motorbato, Bhumikasthan 3-4 RIDO-ARG-W-NCB-13-2081/082
© Copyright Thekkabazar. All Rights Reserved