Filter
Icon Published Date:

July 16, 2025
Icon
Kathmandu
Source : PPMO/EGP
Goods
Icon     Works:
IFB No: NRB/GOODS/NCB/3.2/081/82
Supply, Delivery, Installation, Testing and Commissioning of 125KVA generator-1 (one) set with 150KVA Voltage Stabilizer and Changeover switches at Nepal Rastra Bank, Baluwatar.
Icon Published Date:

July 16, 2025
Icon
Kathmandu
Source : PPMO/EGP
Goods
Icon     Works:
IFB No: NRB/GOODS/NCB/3.3/081/82
Supply, Delivery, Installation, Testing and Commissioning of 200KVA generator- 2 (two) sets, Nepal Rastra Bank, Baluwatar and Biratnagar
Icon Published Date:

July 16, 2025
Tender/Quotation of Construction of Domai Khola Motorable Bridge, Rukum East
Road Infrastructure Development Office, Rukum (East )
Icon
Rukum East
Source : PPMO/EGP
Works
Icon     Works:
IFB No: RIDO/RUK/W/MB/NCB/01/081-82
Construction of Domai Khola Motorable Bridge, Rukum East
Icon Published Date:

July 16, 2025
Icon
Rukum East
Source : PPMO/EGP
Works
Icon     Works:
IFB No: RIDO/RUK/W/MB/NCB/02/081-82
Construction of Lakhar Khola (Bhangeri) Motorable Bridge, Rukum East
Icon Published Date:

July 16, 2025
Icon
Rukum East
Source : PPMO/EGP
Works
Icon     Works:
IFB No: RIDO/RUK/W/TB/NCB/43/081-82
Fabrication, Supply, Transportation, Construction and Erection of Palay Bhurtiwang Suspended Trail Bridge Through Construction Turnkey Package (CTP)
Icon Published Date:

July 16, 2025
Icon
Rukum East
Source : PPMO/EGP
Works
Icon     Works:
IFB No: RIDO/RUK/W/TB/NCB/44/081-82
Fabrication, Supply, Transportation, Construction and Erection of Damchan Ghumliwang Suspended Trail Bridge Through Construction Turnkey Package (CTP)
Icon Published Date:

July 16, 2025
Icon
Palpa
Source : PPMO/EGP
Works
Icon     Works:
IFB No: RPIP/WRIDDOPalpa/NCB-20/081/82
Construction of Main Canal and Associated Structures of Rampur Phant Irrigation Project, Rampur Municipality, Palpa
Icon Published Date:

July 16, 2025
Icon
Kathmandu
Source : PPMO/EGP
Works
Icon     Works:
IFB No: TU-OOR-GAD/W/NCB/2081-082/04
Construction of Civil Works with Installation of Furniture and other Accessories in Senate Hall of Office Building of Vice Chancellor, TU at Kirtipur, Kathmandu
Icon Published Date:

July 16, 2025
Icon
Doti
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 01-RDDOT/2082/083-001
Reactive/Recurrent Maintenance Work of NH09 (Phaltunde-Budar), NH66 (Budar-Syaule) and NH03 (Chaukhutte-Silgadhi, Silgadhi-Syaule and Syaule-Anarkholi)
Icon Published Date:

July 16, 2025
Tender/Quotation of Construction of Prayer and Yoga Hall
Jana Model Secondary School, Birendranagar 6, Surkhet
Icon
Surkhet
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 01/081-082/NCB/Works/JMSS
Construction of Prayer and Yoga Hall
Icon Published Date:

July 16, 2025
Icon
Banke
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 01/082/83
Recurrent (Reactive) Maintenance works along Ratna Rajmarg (Jamunaha to Pandhre khola Section)
Icon Published Date:

July 16, 2025
Icon
Nawalparasi
Source : PPMO/EGP
Goods
Icon     Works:
IFB No: 01/DEV/NCB/IR/2082/83
Procurement of collection of scrap export tax in Devchuli Municipality For F/Y 2082/83
Icon Published Date:

July 16, 2025
Icon
Baglung
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 01/RDBLG/082/8-01
Reactive Maintenance Works on Devisthan-Nisi-Patihalne Road Section ( Ch 1080+960-1095+460); RDBLG/337310113/082/83-01
Icon Published Date:

July 16, 2025
Icon
Baglung
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 01/RDBLG/082/83-02
Reactive Maintenance Works on Kaligandaki Bridge-Baglung-Beni Section; RDBLG/337310113/082/83-02
Icon Published Date:

July 16, 2025
Icon
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 01/RDSPR/2082/83-01
Reactive Maintenance Works on Hulaki Highway (NH 05) Kothikhola-Taulihawa-Rajpur Section (Ch. 583+750~614+000), Kapilvastu
Icon Published Date:

July 16, 2025
Icon
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 01/RDSPR/2082/83-02
Reactive Maintenance Works on Chandrauta - Krishnanagar Road, Kapilvastu
Icon Published Date:

July 16, 2025
Icon
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 01/RDSPR/2082/83-03
Reactive Maintenance Works on NH51 Gorusinghe-Thada Section (Ch. 14+000~50+000).
Icon Published Date:

July 16, 2025
Icon
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 01/RDSPR/2082/83-04
Reactive Maintenance Works on Narpani To Sandhikharka (63+000 to 82+000) Section of Gorusinge-Sandhikharka Road, Arghakhachi.
Icon Published Date:

July 16, 2025
Icon
Kaski
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 03/081/82/GTEVTA
Construction of Boys Hostel Building of Gandaki Technical Education and Vocational Training Academy (GTEVTA), Phedikhola-01, Gurdum, Syangja under Contract ID: 3-GTEVTA-W-NCB-081-82 mainly consists of following works: Construction of Two storied (2 story and basement = Underground basement, ground floor, first floor) RCC frame structured building having plinth area of 708.80 Sq. m. with compounding and landscaping works. The work mainly consists of RCC works, reinforcement works, brick masonry work, wood works, aluminum works, rubble stone masonry work, painting work, plastering work, electrical works, sanitary works, septic tank, water tank, gate construction, compound wall construction, gate construction, granite flooring, interlocking block flooring, retaining walls etc.
Icon Published Date:

July 16, 2025
Icon
Kathmandu
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 06-14-081-82-NCBW-PGPP-KMC
Dhanaganesh Temple Park Construction Work
Icon Published Date:

July 16, 2025
Icon
Banke
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 082/82-01
Reactive (Recurrent) Maintenance work along khairikhola- kohalpur (chainage 789 to 824 ),Banke
Icon Published Date:

July 16, 2025
Icon
Banke
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 082/83-03
Reactive Maintenance Works along HulakiRajmarga, Nepalgunj-Bagauda section (Chainage 0+000 to 20+000 to 30+000), Banke
Icon Published Date:

July 16, 2025
Icon
Banke
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 082/83-04
Reactive Maintenance work along Beluwachowk- Karnali section Bardiya
Icon Published Date:

July 16, 2025
Icon
Banke
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 082/83-05
Reactive Maintenance works along kohalpur-Mankhola(chainage 824-836),Banke.
Icon Published Date:

July 16, 2025
Icon
Banke
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 082/83-06
Reactive Maintenance Work along East-West Highway (Mankholakarnali and AmreniThakurdawara Sadak Khanda).
Icon Published Date:

July 16, 2025
Icon
Kathmandu
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 12-20-081-082-NCBW-PWD-KMC
Construction of Entrance Gate at Thamel
Icon Published Date:

July 16, 2025
Icon
Bardiya
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 12/081-82
Madhuwan na pa ward no 1 & 2 Pattharbojhi Jodne Orahi Nadi ma Pakki Pul Nirman, Bardiya (Design and Build Contract)
Icon Published Date:

July 16, 2025
Icon
Kathmandu
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 14-23-081-82-NCBW-HTD-KMC
Goma Ganesh Temple Reconstruction Works, KMC -01, Naxal
Icon Published Date:

July 16, 2025
Icon
Kathmandu
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 14-24-081-82-NCBW-HTD-KMC
Re-Construction of Jwalamai Temple, KMC-25
Icon Published Date:

July 16, 2025
Icon
Kathmandu
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 14-25-081-82-NCBW-HTD-KMC
Reconstruction of Manisam Mahabihar and Buddhabari Dipankar Buddha Temple, KMC-12
Icon Published Date:

July 16, 2025
Icon
Kathmandu
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 14-26-081-82-NCBW-HTD-KMC
Renovation of Bankali Dharmasala (Phase-1),KMC-08
Icon Published Date:

July 16, 2025
Icon
Kathmandu
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 14-27-081-82-NCBW-HTD-KMC
Dachhi appa cladding and installation of traditional window at Kankeshwori sattal, KMC-19
Icon Published Date:

July 16, 2025
Icon
Kathmandu
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 14-28-081-82-NCBW-HTD-KMC
Construction Work in Nepal Art Council Premises, KMC-11
Icon Published Date:

July 16, 2025
Icon
Rupandehi
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 14/2081/082/REVENUE
Lumbini Bus Terminal Restaurant Rent
Icon Published Date:

July 16, 2025
Icon
Rupandehi
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 15/2081/082/REVENUE
Jitgadi Killa Chamenagriha Rent
Icon Published Date:

July 16, 2025
Icon
Bardiya
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 16/RM/NCB/W/2081/082
Ward No 6 ra 9 ma Tapara, Ishworigunj Sadak Star Unnati Karya
Icon Published Date:

July 16, 2025
Icon
Bardiya
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 17/RM/NCB/GOODS/2081/082
Rajapur Ward No-2 Naya Gaun ko Purbadhar Nirman Karya(Ncell Tower Dekhi Badalpur Intake Jane Sadak kalo Patre)
Icon Published Date:

July 16, 2025
Icon
Bardiya
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 18/RM/NCB/GOODS/2081/082
Manpur-Tapara-Ishworigunj Charmohada –Baniyapur-Chainpur Sadak Starunnati
Icon Published Date:

July 16, 2025
Icon
Bardiya
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 19/RM/NCB/GOODS/2081/082
Pakhaipur-Kajanipur-Bhagranpur Sadak Starunnati Karya
Icon Published Date:

July 16, 2025
Icon
Bardiya
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 20/RM/NCB/GOODS/2081/082
Rajapur Na.Pa.Balabazar Chowk Dekhi Purba Healthpost Samma Sadak Star Unnati(Balabazar Bhitri Sadak)
Icon Published Date:

July 16, 2025
Icon
Bardiya
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 21/RM/NCB/W/2081/082
Jayapur Belbhariya ,Maila Nala Pul ,kajenipur, Ishworigunj,Sadak Main pul,Dayarampur Maila Nala Ma Sadak Star unnati
Icon Published Date:

July 16, 2025
Icon
Bardiya
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 22/RM/NCB/W/B/2081/082
Prabidhik Shikshyalaya Bhawan Nirman Lalita Ma.Vi. Rajapur-8,Dhobinpur,Bardiya
Icon Published Date:

July 16, 2025
Icon
Bhaktapur
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 23-081/82/Works/Climate/FWSSMP-Bhaktapur
Construction of Intake, RCC water tank, Transmission and Distribution Pipe line works in Namobuddha 1 and 11, Kavre
Icon Published Date:

July 16, 2025
Icon
Kathmandu
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 32-46-081-82-NCBW-KMC
Installation of Road Furniture at Major Road Sections within KMC
Icon Published Date:

July 16, 2025
Icon
Kathmandu
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 32-47-081-82-NCBW-KMC
Traditional Falcha Construction Work in Various Places Within KMC
Icon Published Date:

July 16, 2025
Icon
Kathmandu
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 32-48-081-82-NCBW-KMC
Reconstruction of Front Facade of Houses from Krishna Mandir to Bhawa Ku Twa in Traditional Style, KMC-05
Icon Published Date:

July 16, 2025
Icon
Kathmandu
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 32-49-081-82-NCBW-KMC
Reconstruction of Front Facade from Seto Dhoka to Jaya Bageshwori in Traditional Style, KMC-08
Icon Published Date:

July 16, 2025
Icon
Nawalparasi
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 37.SUN/NCB/2081/82
Cities 4 Women (C4W) Inclusive and Climate Resilient Urbanization in Nepal;Bal Udhyan Park,Sunwal-01
Icon Published Date:

July 16, 2025
Icon
Bhojpur
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 47-081/82
Construction of Yaiselu River Motorable Bridge.
Icon Published Date:

July 16, 2025
Icon
Bhojpur
Source : PPMO/EGP
Works
Icon     Works:
IFB No: 48-081/82
Construction of Thumlung Khola Motorable Bridge.

© Copyright Thekkabazar. All Rights Reserved

Designed by and developed by:   IT Nepal Solutions