Works:
IFB NO : NEA-SDC-2081/82-4(SQ) || Extension of HT Line at Kaligandaki Rural Municipality, Harmichaur to Arbeni on Syangja DCS .
Works:
IFB NO : ORRM-W-NCB-18-081/82 || Adhuro Vayarthan Mandir Samrakshan Ra Gnawa Durga Mandir Akikrit Bikash Yojana Ruru 4 Gulmi
Works:
IFB NO : RRM/SQ/WORKS-09/081/82 || UPGRADING OF SAURPANI RANIKUWA ROAD (RIBDIKOT-3) & BAHUNDANDA MASURE ROAD (RIBDIKOT-4)
Works:
IFB NO : RRM/SQ/WORKS-10/081/82 || Upgrading of Somar to Chorbot Bridge Road Ribdikot Ga Pa 8 Pheka
Works:
IFB NO : WRIDDB/NCB/DRTW/12/081-82 ||| Construction of Embankment, Gabion Check Dam and RCC Drain Works at Duduwa Khola, Ekatanagar, Kohalpur-10, Banke
Works:
IFB NO : RIDO/BANKE/ROAD/W/NCB/110/081-82 || Construction of three Roads A) Nakatole Sadak B) Jabda road Bhanu kabadiya ko Ghar Dekhi Maddhali ko ghar C) Rcc drain and PCC roadat Kumkum Parler Dekhi Pasang Lamu Road
Works:
IFB NO : RIDO/BANKE/ROAD/W/NCB/109/081-82 || Construction of Three roads A)Sagun Shrestha ko Ghar Dekhi Paschim Tarfa Ra Fultekra Road Dekhi Dachin purba B) Hari Gosae ko ghar dekhi Pachhim Daljit Rasaeliko Uttar Dilip Regmi ghar samma ra Pachhim tarfa Hasta B.k ko ghar Hudai Sagun Shrestha ko Ghar Samma C) yektanagar tol Rajkumari Thapa ko Ghar Hudai Ram Bahadur B K ko ghar Hudai Sagun Shrestha Ghar Hudai Durga Nepali ko ghar
Works:
IFB NO ; RIDO/BANKE/ROAD/W/NCB/111/081-82 || Slab Culvert and Retaining wall at Jog Gau Dekhi Badhaiya Samma
Works:
IFB NO : RIDO-ARG-W-NCB-123-2081/082 || Upgrading of Shitganga 2 ko Dhara dekhi Supa khola hudai Nepane Patala tole sammako nali sahitko sadak
Works:
IFB NO : RIDO/BANKE/ROAD/W/NCB/113/081-82 || Rcc Drain at Ganesh mandir Dekhi ward no 17 ko Simana Samma Nalisahit Esterunnatti
Works:
IFB NO : NCB/WORKS/SDDOD/20/081/082 || Shree Ma.Bi Balapur ma Prakhal Nirman ra, Bhawan ko Finishing ko Kam Tulsipur 2 Dang.
Works:
IFB NO ; RIDO/BANKE/ROAD/W/NCB/112/081-82 || RCC drain at Bankatwa Gau Duduwa Ga pa 3
Works:
IFB NO : RIDO-ARG-W-NCB-122-2081/082 || Pokharathok Salyan Karsawa motorbato, Arghakhanchi
Works:
IFB NO : RIDO/BANKE/ROAD/W/NCB/113/081-82 ||| Rcc Drain at Ganesh mandir Dekhi ward no 17 ko Simana Samma Nalisahit Esterunnatti
Works:
IFB NO : NCB/WORKS/SDDOD/20/081/082 || Shree Ma.Bi Balapur ma Prakhal Nirman ra, Bhawan ko Finishing ko Kam Tulsipur 2 Dang.
Works:
IFB NO : RIDO/BANKE/ROAD/W/NCB/112/081-82 || RCC drain at Bankatwa Gau Duduwa Ga pa 3
Works:
IFB NO : 08/SM/NCB/Road/2081/082 || Upgrading of Road from Dudhamari Jestha Nagarik Bhawan to Shivganj in ward no 3 of Shivasatakshi Municipality, Jhapa
Works:
IFB NO : 08/SM/NCB/Road/2081/082 || Upgrading of Road from Dudhamari Jestha Nagarik Bhawan to Shivganj in ward no 3 of Shivasatakshi Municipality, Jhapa
Works:
IFB NO : IDO/UDA/NCB/W/R/25/081-082 || Dadaghar Pipalbot Chhatibanko Rukh Hudai Gallimuni Bajgara Sarki Gaun Road Track Open, Rawabesi 3, Khotang
Works:
IFB NO : IDO/UDA/NCB/W/R/23/081-082 || Upgrading of Maruwa -Dumsi-Jhopu Road, Katari 4, Udaypur
Works:
IFB NO : IDO/UDA/NCB/W/R/22/081-082 || Upgrading of Kapase Sukalahi Bokedhik Gairitol, Namunatol, Bargaun, Dharampur hundai Simalpur sadak, Triyuga Na. Pa.- 7 and 8, Udayapur
Works:
IFB NO ; IDO/UDA/NCB/W/R/20/081-082 || Upgrading of Diktel Rupakot Majuwagadi Na.Pa.-14 Bijule Buipa Bamrang Diktel Road, Di. Ru. Ma.Na.Pa.-14, Khotang
Works:
IFB NO : MRM/MGD/NCB/WORKS/081/082-04 || Construction of dam at dukhubesi upallo kulo muhan and excavation of medium rock manually at landslide prone area.
Works:
IFB NO : IDO/UDA/NCB/W/R/19/081-082 || Upgrading of Bhagarpur Kurima Road, Sakela Ga.Pa.-1, Sekhuwa, Khotang
Works:
IFB NO : 08/SM/NCB/Cons/2081/082 || Construction of Nagar Smart School
Works:
IFB NO : MIP/CAP-01/081-82 ||Command Area Protection Works at different Places of Kanchanpur District
Works:
IFB NO : BIP-BB5-2081/82 || Constrcution of Chainlink, Children Park & Gym Yard and other allied works along Left bank of Bagmati River from Tinkune Bridge to Manohara Dovan.
Works:
IFB NO : KVDA/BKT/NCB/WORKS/081/82-12 || Construction of foothpath & railing works at Dakshin Barahi Park Suryabinayak 04
Works:
IFB NO : KVDA/BKT/NCB/WORKS/081/82-13 || Construction of Specially Abled Foothpath at Thimi 2 Football ground road, Suryabinayak 6 & 8 Suryabinayak Mandir road, Bhaktapur Mun 09 Brahmayani Road, Changunarayan -08 Sudal Road and flag stone laying at Bhaktapur 01 Bhaju Pokhari
Works:
IFB NO : MMSI/WORKS/NCB/2081-82/25 || Upgrading Works Of Fatte Dauchet Dubachaur Sadak.
Works:
IFB NO : MRM/NCB/works/07/081-082 ||| Gitachaur Health Unit Prefab Building Construction Work.
Works:
IFB NO : IDO/BHO/W/NCB-11/081/82 || Upgrading works of Sitalpati-Kirat Chowk-Mathillo Bato-Jaladhar Road
Works:
IFB NO : NCB/JHAPA/JRM/GOODS/04/081-82 || Supply and delivery of 25 sqmm ABC cable 2 core with electrical pole Accessories
Works:
IFB NO : IDO/BHO/W/NCB-09/081/82 || Upgrading works of Rudrabari-Pakhatole-Thanidanda Road
Works:
IFB NO : BRM/NCB/WORKS/003/2081/082 || Construction of RCC Culvert, Stone Masonry Culvert, Side drain, Retaining Structure at Bagmati 2 & 3
Works:
IFB NO ; IDO/UDA/NCB/W/R/20/081-082 || Upgrading of Diktel Rupakot Majuwagadi Na.Pa.-14 Bijule Buipa Bamrang Diktel Road, Di. Ru. Ma.Na.Pa.-14, Khotang
Works:
IFB NO : IDO/UDA/NCB/W/R/19/081-082 || Upgrading of Bhagarpur Kurima Road, Sakela Ga.Pa.-1, Sekhuwa, Khotang
Works:
IFB NO : BIP-UN3-2081/82 || Construction of Plum wall and footpath Section damaged by flood at UN park, Lalitpur.
Works:
IFB NO : MIP/CAP-01/081-82 || Command Area Protection Works at different Places of Kanchanpur District
Works:
IFB NO : BIP-BB5-2081/82 || Constrcution of Chainlink, Children Park & Gym Yard and other allied works along Left bank of Bagmati River from Tinkune Bridge to Manohara Dovan
Works:
IFB NO : MMSI/WORKS/NCB/2081-82/25 || Upgrading Works Of Fatte Dauchet Dubachaur Sadak.
Works:
IFB NO : MRM/NCB/works/07/081-082 || Gitachaur Health Unit Prefab Building Construction Work.
Works:
IFB NO : || NCB/JHAPA/JRM/GOODS/04/081-82 Supply and delivery of 25 sqmm ABC cable 2 core with electrical pole Accessories.
Works:
IFB NO : MMSI/WORKS/NCB/2081-82/23 || Construction Of Hostel At Janata Secondary School.
Works:
IFB NO : RIDO/BANKE/ROAD/W/NCB/108/081-82 || Rigid pavement work at Sahit smarak dekhi sairan tower hudai Prem Budha ko ghar samma ko Road
Works:
IFB NO : IDO/Dailekh/W/NCB/34/081-082 || Taraghat Khola (Approached Road), Dailekh
Works:
IFB NO ; 01/NWSCHEMJA/HDPE/2081-82|| Supply and Delivery of HDPE pipes in Hemja
Works:
IFB NO ; 01/NWSCHEMJA/HDPE/2081-82|| Supply and Delivery of HDPE pipes in Hemja
Works:
IFB NO ; RIDO/BANKE/ROAD/W/NCB/107/081-82 ||| Slab Culvert extension work , Road side drain & Toe wall work at Khajura 5 Udharapur dekhi B Gau Gaupalika samma road
Works:
IFB NO ; RIDO/BANKE/ROAD/W/NCB/107/081-82 ||| Slab Culvert extension work , Road side drain & Toe wall work at Khajura 5 Udharapur dekhi B Gau Gaupalika samma road
© Copyright Thekkabazar. All Rights Reserved