Works:
IFB NO : (DHM/MFD/C/EOL04-2081/82). || "Consulting of IT Service for the Regular Operation and Management of Aviation Meteorology Services"
Works:
Procurement of Fixed Assets Management System & Inventory Management System
Works:
IFB NO : JANAKI/W/SQ/NCB-01/081/82 || Janaki-04 Shree Janchahana Pra. Vi. Ma Purbadhar Nirman, Banke- Construction of Boundary Wall
IFB NO : JANAKI/W/SQ/NCB-02/081/82 ||| Janaki-05 Shree Loktantrik Pra. Vi. Ma Sauchale Nirman, Banke- Construction of Toilet
IFB NO : JANAKI/W/SQ/NCB-03/081/82 || Janaki-02 Shree Ma. Vi. Joga gaau Ma Purbadhar Nirman, Banke- Construction of Toilet/Parking Truss
IFB NO : JANAKI/W/SQ/ NCB-04/081/82 || Janaki-03 Darul ulum masjid Garib Nawaz ma purbadhar Nirman. banke-Construction of Building Slab & Cycle Stand
IFB NO : JANAKI/W/SQ/NCB- 05/081/82 || Janaki-06 Shree Ne. Ra. Ma. Bi. Ma Purbadhar Nirman,Banke- Construction of Cycle Stand & Mandir Nirman
IFB NO : JANAKI/W/SQ/NCB-06/081/82 || Janaki-01 Shree shivpur Mi. Bi. Maa Purbadhar Nirman, Banke- Construction of Building
Works:
Interior decorators at Kathmandu
Works:
Standard Double cab pickup, Right Hand Drive model with four wheel drive and air conditioning System.
Diesel Engine developing Maximum rated power output not less than 45 kw at governed RPM, Torque not less than 190NM.
Works:
IFB NO : BM/NCB/W/ 03/2081-082 || Bikash Kendra Access Road, Toilet, Changing Room with truss Structure & Miscellaneous Works
Works:
IFB NO : 04/SRM/NCB/081/82 || Construction of 2 -storyed 4 Rooms RCC Building in Ma vi Tulsipur School
IFB NO : 05/SRM/NCB/081/82 || Nayabasti Baghkhor Kalapokhara hudai Salyan Jodne Road Kalopatre Ward no.1
Works:
IFB NO : GRM/SQ/GOODS/ 03/081/82 || Supply of Veterinary Medicines and Vaccines
Works:
IFB NO : BRM/PAR/G /NCB/MTCM 01/081/82 || Procurement,Delivery and Fittings of Mini tiller and Combined Mill at Bihadi rural Muncipality
Works:
IFB NO : KM/081/082-08 || Kapilvastu Nagarpalika Wada No 3 Ma Chaurikh Hajar Chowkma Raheko Kapilvastu Sahid Smriti Pratisthan Bhawan Nirman
IFB NO : KM/081/082-09 || Construction of School Building of Sitalabaksha Ma. Vi. KMNP-11 Rehara
Works:
IFB NO : 10/081/82 || Extraction and Collection of River-basin Materials (Stone, Gravel and Sand) from Tawa Khola, Kapurbote Basin Area, Ward no. 7
Works:
IFB NO : ORRM-W-NCB-25-081/82 || Sadak Board Bhatkuwa Mo. Ba
Works:
IFB NO : 09/081/82 || Extraction and Collection of River-basin Materials (Stone, Gravel and Sand) from Tawa Khola, Barmajhiya Gaun, Ward no. 5
Works:
IFB NO : 08/081/82 || Extraction and Collection of River-basin Materials (Stone, Gravel and Sand) from Hadaiya Khahare Dobhan, Ward no. 3
Works:
IFB NO : CRM/ARG/SQ/W/17/081/082 || Jeevenjyoti Aa Vi Toilet Construction Works, Chhatradev-06
IFB NO : CRM/ARG/SQ/W/18/081/82 || Tallo Jhirbas Pauwa Puna Nirman, Chhatradev-02
Works:
IFB NO : 06/081/82 || Extraction and Collection of River-basin Materials (Stone, Gravel and Sand) from Tribeni Ghat Mela, Khoksa Area River-basin Area, Ward no. 2
Works:
IFB NO : 06/081/82 || Extraction and Collection of River-basin Materials (Stone, Gravel and Sand) from Tribeni Ghat Mela, Khoksa Area River-basin Area, Ward no. 2
Works:
IFB NO : 05/081/82 || Extraction and Collection of River-basin Materials (Stone, Gravel and Sand) from Kamala River Bhunte Chauri River-basin Area, Ward no. 2
Works:
IFB NO : SM/RD/ 081/082/24 || Farka bahadur ko ghar dekhi turuntapur sammako adhuro sadak kalopatre / Chamarbojhiya gaun samma adhuro sadak kalopatre
IFB NO : SM/BDG/W3/081/082/25 || Durga bhagawati madhyamik bidhyalaya shivraj-03, nayabasti
IFB NO : SM/BD/W10/081/082/26 || Nepal rastriya aadharbhut bidhyalaya, shivraj-10 shitalapur
IFB NO : SM/BDG/W6/081/082/27 || Aadharbhut bidhyalaya shivraj-06, dharmanagar
Works:
IFB NO : 04/081/82 || Extraction and Collection of River-basin Materials (Stone, Gravel and Sand) from Timnahi River-basin Area, Ward no. 1
Works:
IFB NO : 03/081/082 || Extraction and Collection of River-basin Materials (Stone, Gravel and Sand) from Sisneri River-basin Area, Ward no. 1
Works:
IFB NO : NPHQ/CIB/G/SQ/2081-2082/02/RE || Supply, Delivery and Installation of Forensic Work Station
Works:
IFB NO : BIMO-BIS-NCB-11-2081/82 || Construction of canal and canal structures at various places of Banganga Irrigation System, Kapilvastu
Works:
IFB NO : DHM/OHMK/W/SQ/02/2081-82 || Maintenance and Construction Work at Different Meteorological Station
Works:
IFB NO : DHM/OHMK/W/SQ/01/2081-82 || Construction and Maintenance Works at different Hydrological Stations Located inKarnali, Bheri, and Babai River Basins
Works:
Construction work at Nawalparasi
Works:
IFB NO : UDBO/ROLPA/SQ/WORKS/27-2081/82 || Construction of Road Works.
Works:
IFB NO : UDBO/ROLPA/SQ/WORKS/26-2081/82 || Construction of Road Works.
Works:
IFB NO : UDBO/ROLPA/SQ/WORKS/24-2081/82 || Construction of Road Works
Works:
IFB NO : UDBO/ROLPA/SQ/WORKS/24-2081/82 || Construction of Road Works
Works:
IFB NO : UDBO/ROLPA/SQ/WORKS/21-2081/82 || Construction of road and drain works
Works:
IFB NO : UDBO/ROLPA/SQ/WORKS/23-2081/82 || Construction of Foot Track
Works:
IFB NO : LDC-081/082-03(SQ) || Construction,Testing and Commissioning of HT/LT Line at Different Places of Rishing, Ghiring & Myagde Rural Municipality and Bhimad & Shuklagandaki Municipality Under Lekhnath Distribution Center
Works:
IFB NO : MoHP/DH/HM/SQ/06/2081/82 || Hospitalized Materials Supply for Dadeldhura Hospital
Works:
IFB NO : MoHP/DH/HM/SQ/06/2081/82 || Hospitalized Materials Supply for Dadeldhura Hospital
Works:
IFB NO : NCB-PPSCMP-081/82-01 || Supply and delivery of SUV Vehicle
Works:
IFB NO : MoHP/DH/HM/SQ/06/2081/82 || Hospitalized Materials Supply for Dadeldhura Hospital
Works:
IFB NO : UDBO/ROLPA/SQ/WORKS/16-2081/82 || Road Construction works.
Works:
1 set server at Kavre
Works:
IFB NO : UDBO/ROLPA/SQ/WORKS/15-2081/82 || Construction works of Road & Drain.
© Copyright Thekkabazar. All Rights Reserved