Filter
All Tender
Icon
Icon
Icon Published Date:

April 4, 2025
Icon
Kailali
Source : PPMO/EGP
Works

29 days left

Icon     Works:
IFB No: P7/SPPB/NCB/WORKS/2081-82/02
Construction Works of Incharge Quarter, Senior Officer's Quarter, Garage, Canteen, Trade shop, Underground Water Tank and Allied Works.
Icon Published Date:

April 4, 2025
Icon
Sarlahi
Source : PPMO/EGP
Works

29 days left

Icon     Works:
IFB No: PEP-3/BRRFCW/NCB-05/081-82
Construction of Embankment and Revtement at Haripuwa NP -7,8 ,Harsaha , L/S of Banke River Sarlahi.
Icon Published Date:

April 4, 2025
Icon
Sarlahi
Source : PPMO/EGP
Works

29 days left

Icon     Works:
IFB No: PEP-3/JHRFCW/NCB-04/081-82
Construction of Embankment strengthening and Protection at Brahampuri -4 , Tribhuwanagar L/S of Jhim River Sarlahi.
Icon Published Date:

April 4, 2025
Icon
Sarlahi
Source : PPMO/EGP
Works

29 days left

Icon     Works:
IFB No: PEP-3/LKRFCW/NCB-01/081-82
Construction of Embankment and Revetment at Kaudena-1 , Sukhchaina at R/S & L/S of Lakhandehi river, Sarlahi
Icon Published Date:

April 4, 2025
Icon
Sarlahi
Source : PPMO/EGP
Works

29 days left

Icon     Works:
IFB No: PEP-3/LKRFCW/NCB-02/081-082
Construction of Embankment and Revetment at Kaudena-5, Chhapkaiya, at L/S of Lakhandehi river Sarlahi
Icon Published Date:

April 4, 2025
Icon
Sarlahi
Source : PPMO/EGP
Works

29 days left

Icon     Works:
IFB No: PEP-3/LKRFCW/NCB-03/081-82
Construction of Embankment and Revetment at Kaudena-6,7,Sakraual Shibnagar, R/S of Lakhandehi River Sarlahi.
Icon Published Date:

April 4, 2025
Icon
Kailali
Source : PPMO/EGP
Goods

29 days left

Icon     Works:
IFB No: WSSDO/KAILALI/NCB/GOODS/18/2081-82
Supply and Delivery of HDPE Pipe (PE-100) -(Confirming to NS 40:2079) for Various Water Supply Projects of Kailali and Kanchanpur District.
Icon Published Date:

April 4, 2025
Icon
Kailali
Source : PPMO/EGP
Works

29 days left

Icon     Works:
IFB No: WSSDO/KAILALI/NCB/WORKS/19/2081-82
Supply, Installation, Testing and Commissioning of RO hot and cold water system at different locations of Kailali and Kanchanpur Districts.
Icon Published Date:

April 4, 2025
Icon
Kailali
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: 01/2081-82/CoF/NCB/FWSSMP/Kailali
Construction of Lamki Chuha Co-Financing Water Supply and Sanitation Project Package-II, Kailali
Icon Published Date:

April 4, 2025
Icon
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: 68-BMC/081/082/W/NCB/122
Construction of Blacktopped Road from Shreekrishna Pandit's House to Eastward Road, BMC-18
Icon Published Date:

April 4, 2025
Icon
Pyuthan
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: 80/81/82
Road Upgrading work along Pyuthan-Bijuwar-Dhanti-Dhungethati-Aresh Rolpa in Pyuthan District (CH: 0+000 to 4+500)
Icon Published Date:

April 4, 2025
Icon
Pyuthan
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: 81/81/82
Roadway Upgrading of Beluwa-Khaira-Banskhola-Saribang Road in Pyuthan District ( Saribang-Bijuwar Section)
Icon Published Date:

April 4, 2025
Icon
Pyuthan
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: 82/81/82
Roadway Upgrading of Beluwa-Khaira-Banskhola-Saribang Road in Pyuthan District ( Bijuwar- Beluwa section)
Icon Published Date:

April 4, 2025
Icon
Pyuthan
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: 83/81/82
Roadway Upgrading of Vitrikot-Bijuwar-Bhanjang-Jhakristhan sadak, Puthan District (Bijuwar-Vitrikot Section)
Icon Published Date:

April 4, 2025
Icon
Pyuthan
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: 84-81/82
Roadway Upgrading of Vitrikot-Bijuwar-Bhanjang-Jhakristhan sadak, Puthan District (Bijuwar-Jhakristhan Section)
Icon Published Date:

April 4, 2025
Icon
Pyuthan
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: 85-81/82
Road Upgrading work along Pyuthan-Bijuwar-Dhanti-Dhungethati-Aresh Rolpa in Pyuthan District (CH 4+500 to 7+500)
Icon Published Date:

April 4, 2025
Icon
Nawalparasi
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: BAR/NCB/Works/42/081/082
Blacktop Road Construction of Milanchowk to Pashim Santaunna Road, Bardaghat-13
Icon Published Date:

April 4, 2025
Tender/Quotation of Construction Works of Krishi Bidhutikaran for Deep Boring
Office of Muncipal Executive, Bode Barsain Municipality, Saptari
Icon
Saptari
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: BBMS/NCB/WORKS/2081/082-06
Construction Works of Krishi Bidhutikaran for Deep Boring
Icon Published Date:

April 4, 2025
Icon
Sarlahi
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: BRM/NCB/Works/3/2081-82
Adhuro Deep Boring ko Transfarmar, Bidhut Pole, Tar tatha Pipe line Bistar, Bishnu Ga.pa. 5 & 6 Sarlahi
Icon Published Date:

April 4, 2025
Icon
Makwanpur
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: BRMMK/NCB/CCGW/10/2081.082
Sub-structure and superstructure works, brick masonry with first class brick, plaster works, painting work, etc.
Icon Published Date:

April 4, 2025
Tender/Quotation of Procurement, Supply & Delivery of Sanitary Pads at Birtamode Municipality, Jhapa
Birtamode Municipality, Office of Municipal Executive, Birtamod Jhapa
Icon
Jhapa
Source : PPMO/EGP
Goods

28 days left

Icon     Works:
IFB No: BTMMUN/GOODS/NCB-16/081/82
Sanitary Pads at Birtamode Municipality, Jhapa
Icon Published Date:

April 4, 2025
Icon
Ilam
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: FWSSMPILAM/08/081/82/NCBW
1. The project is pumping cum gravity type located in Mai Municipality 6,7 & 8 of Ilam district. The scope of the work includes the construction of the entire water supply network of scheme-2 of the Mai Municipality Large Water Supply Project, spanning Mai Municipality-1 to 10, Ilam, as specified in the location drawing.
Icon Published Date:

April 4, 2025
Icon
Ilam
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: FWSSMPILAM/09/081/82/NCBW
The project is an existing gravity type located in Suryodaya Municipality of Ilam district. The scope of the work includes the construction of the Slow Sand Filter and its allied works, as specified in the location drawing.
Icon Published Date:

April 4, 2025
Icon
Mustang
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: GRMJ/NCB/W/07/081/082
Maintenance and repairing of Stone building Structure in Jomsom.
Icon Published Date:

April 4, 2025
Icon
Kailali
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: GWRIDDO/PH-DS-ELE-PUMP/NCB/39/2081-082
Construction of Pump house ,MS fittings with distribution systems, Electrification and Pump works.
Icon Published Date:

April 4, 2025
Icon
Syangja
Source : PPMO/EGP
Goods

28 days left

Icon     Works:
IFB No: HRM/NCB//G/03/081/082
Procurement of Mini Tiller for Harinas Rural Municipality and Supplying them for Ward of Rural Municipality
Icon Published Date:

April 4, 2025
Icon
Nawalparasi
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: Hup/Ncb/W/07/081/82
Construction Work.
Icon Published Date:

April 4, 2025
Icon
Mugu
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: IDO/MUGU/W/NCB/18/2081/082
Upgrading of Talcha Rara Sadak Kalopatre Chhayanath Rara Na. Pa. Mugu.
Icon Published Date:

April 4, 2025
Icon
Mugu
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: IDO/MUGU/W/NCB/19/2081/082
Construction of Kushatauka Dekhi Ryanchakati Sadak Nirman
Icon Published Date:

April 4, 2025
Icon
Mugu
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: IDO/MUGU/W/NCB/20/2081/082
Construction of Putta Khola Bhanekhola Rolasaina sadak Nirman Khatyad
Icon Published Date:

April 4, 2025
Icon
Mugu
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: IDO/MUGU/W/NCB/21/2081/082
Construction of Ramnikadh Higoti Rekheya Gramin Sadak Khatyad
Icon Published Date:

April 4, 2025
Icon
Mugu
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: IDO/MUGU/W/NCB/22/2081/082
Construction of Alkasaghucharapu Sadak Nirman
Icon Published Date:

April 4, 2025
Icon
Mugu
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: IDO/MUGU/W/NCB/23/2081/082
Panche Gamtha Raskotibada Neta Nakharji Dhogarna Hachuli Sukhadhik Jhugala, Khatyad RM(Section 2-Bajeri Pahiro)
Icon Published Date:

April 4, 2025
Icon
Mugu
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: IDO/MUGU/W/NCB/24/2081/082
Kalakada Panche Khatyad Road (Section 2)
Icon Published Date:

April 4, 2025
Icon
Dolakha
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: IDODLK/W/NCB/65/081/082
Balgriha Mahankal Maghadeurali Sadak Dolakha (Ch. 0+682.50 to Ch. 3+100 KM)
Icon Published Date:

April 4, 2025
Icon
Dolakha
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: IDODLK/W/NCB/66/081/082
Charikot Deurali Kalinchok Sadak(Gairi Kuri Khanda), Dolakha (Ch. 11+050 to Ch. 17+350 KM)
Icon Published Date:

April 4, 2025
Icon
Kaski
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: IDOKASKI/W/BRG/NCB/MY/06/2081-082
Construction of Sardikhola Motorable Bridge Machhapuchchhre 2 (Lamachaur Machhapuchchhre Road), Kaski
Icon Published Date:

April 4, 2025
Icon
Kaski
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: IDOKASKI/W/R/NCB/MY/08/2081-082
Upgrading of Inner Road from Dandako Nak to Sishuwa Chowk, Pokhara 27 and 29, Kaski
Icon Published Date:

April 4, 2025
Icon
Kaski
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: IDOKASKI/W/R/NCB/MY/09/2081-082
Construction/Upgrading of Sat Muhan Rupakot Thumki Sadak, Rupa Ga.Pa., Kaski
Icon Published Date:

April 4, 2025
Icon
Kaski
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: IDOKASKI/W/R/NCB/MY/10/2081-082
Kaure Jyaudu Tangting Road (Jyaudu Tangting Section), Madi-02, Kaski
Icon Published Date:

April 4, 2025
Icon
Bajhang
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: JPSSBJH/NCB/W/S/02-2081/2082
Janapriya Secondary School Toilet Construction Works
Icon Published Date:

April 4, 2025
Icon
Parbat
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: JRM/NCB/W/06/2081-82
Construction of Basic Health Post Building at Jaljala Rural Municipality-08, Naglibang
Icon Published Date:

April 4, 2025
Tender/Quotation of Upgradation of Deukhola, Bhalukapche, Triveni, Dhorpatan Road Project, up to Baglung, Rukum East
Local Infrastructure Development Project Office(LIDPO), Lumbini Province,Butwal
Icon
Rupandehi
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: LIDPO/LUMBINI/NCB/W/R/081_082/197
Upgradation of Deukhola, Bhalukapche, Triveni, Dhorpatan Road Project, up to Baglung, Rukum East
Icon Published Date:

April 4, 2025
Icon
Rupandehi
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: LIDPO/LUMBINI/NCB/W/R/081_082/198
Upgrading of Bhalukapche, Simalchaur, Baluwa, Sera, Damchan,Tupa Hudai Dhorpatan Jodne Motor Bato, Rukum East
Icon Published Date:

April 4, 2025
Icon
Rupandehi
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: Lidpo/Lumbini/NCB/W/R/081_82/199
Upgrading of Access Road from Krishi Samagri Sansthan Rajmarga to Alaiche Kuwa, Tansen Mun-7, Palpa
Icon Published Date:

April 4, 2025
Icon
Lalitpur
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: LMC-NCB-WORKS-2081/82-14
Construction Of Pedestrian and Bicycle Bridge at Dhobighat
Icon Published Date:

April 4, 2025
Icon
Sindhupalchok
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: MMSI/WORKS/NCB/2081-82/36
Infrastructure Development Works of Melamchi Bazar
Icon Published Date:

April 4, 2025
Icon
Kailali
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: MOLMAC/KAILALI/WORKS/NCB/01/081/081
1.Ministry of Land,Agriculture And Cooperatives Security Post And Police Building Construction.Dhangadhi,Kailali
Icon Published Date:

April 4, 2025
Icon
Kailali
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: MOLMAC/KAILALI/WORKS/NCB/02/081/081
1.Sudurpachim University Ko Krishi Sayank Tikapur ma High-tech Nursery Nirman.Tikapur ,Kailali
Icon Published Date:

April 4, 2025
Icon
Nawalparasi
Source : PPMO/EGP
Works

28 days left

Icon     Works:
IFB No: NA/NO.2FESBN/NCB/WORKS/081/82/08
Dam and Artificial Lake Construction Work at Ghumauri Khola, Nawalpur (Bardhaghat susta purba)

© Copyright Thekkabazar. All Rights Reserved

Designed by and developed by:   IT Nepal Solutions