IFB No: KHRP-03-2081/082 Road Upgrading/Rehabilitation Works along Kanti Highway from Chainage 51+000(Baguwa) to 65+000(Takhurche) and Chainage 71+000(Tinpane) to 79+000(Tikabhairab) [Except 74+900 to 75+050 (Bhaise Khola Landslide), 73+700 to 73+850 (Birkhedhara Landslide) and 71+400 to 71+500 (Tinpane Landslide)]
IFB No: TRM/NCB/WORK/06-03RE2/2081-082 THIS IS COMMUNINTY BASED PROJECT AND 50 % CONTRIBUTION HAS BEEN DONE BY HOUSE OWNER WITH 9 NOS OF BUILDING CONSTRUCTION.
IFB No: NEA-HDC-2081/082-SQLTLine-04RE Construction of 400/220 V LT Line and Transportation of Line Materials From NEA KPO Office Store Surkhet to NEA Heldung DCs Store to Erection Site of Namkha RM, Humla.