Works:
२x२ फोल्डिङ सिटभएको डिलक्स बस भाडामा लिने ||
Works:
IFB NO : NEA/KNPDC/SQ/2081/082-04(Re) || Truss Works for Open Store at Kanchanpur Distribution Centre (Balardah Substation).
IFB NO : NEA/KNPDC/SQ 2081/082-06 || Truss Shed Construction Works Above Counter Building at Kanchanpur
Works:
IFB No : 05/CJRMUN/SQ/2081/082 || Construction of Guard House & Compound Wall of Industrial Gram (Est Amt 17,56,113.13)
Works:
IFB No : IDO/RKM/NCB/W/2081-82/56 || Construction Work of T'hatibot Mathillo Galampati Road Musikoy Municipality 10, Rukum West.(Est Amt 25,50,402.87)
IFB No : IDO/RKM/NCB/W/2081-82/57 || Construction Work of Chinnebagar Bhurungkhola Neta Road Upgrading. Chaurjahari Municipality Rukum West &Salyan. (Est Amt 22,97,948.22)
IFB No : IDO/RKM/NCB/W/2081-82/58 || Construction of I. N. Foundation Infrastructure Package-II. (Est Amt 16,78549.47)
IFB No : IDO/RKM/NCB/W/2081-82/58 || Construction of Office Building and other supporting structures for Trail Center Rukum (Est Amt 35,21,774.83)
Works:
IFB No : IRM/NCB/WSP/01/2081/082 || Construction of Purandi Bahuayamik Watersupply Project (Est Amt NRs 93,98,189.92)
IFB No : IRM/NCB/Roads/04/081/82 || Construction and Improvement of Dewaltar and Tallo Jyamire Road Project (Est Amt NRs 17,22,992.43)
IFB No : IRM/NCB/Building/02/081/82 || Construction of Purandi & Humane Community Building, and Kaflenni Toilet Building (Est Amt NRs23,99,099.85)
Works:
IFB NO : URL-Mandir-Ward9-Works-NCB-09-081/82 || Maharaj Durga Mandir, urlabari-9, Morang (Est Amt NRs. 24,71,541.41)
Works:
IFB No : WIDDARG/NCB-20/081-82 || Construction of Intake,Canal & Canal Structure Works at Sandhikharka-4 & Chhatradev-6 (Est Amt NRs. 13333835.08)
IFB No : WIDDARG/NCB-21/081-82 || Construction of Intake,Canal & Canal Structure Sandhikharka-6,Arghakhanchi (Est Amt NRs. 13737206.91)
IFB No : WIDDARG/NCB-22/081-82 || Construction & Intake,Canal & Canal Structure Works at Shitganga-11,Arghakhanchi (Est Amt NRs. )
IFB No : WIDDARG/SQ-24/081-82 || Construction of Canal & Canal Structure Works at Sandhikharka-1 & 2 ,Arghakhanchi (Est Amt NRs. 1438545.56)
IFB No : WIDDARG/SQ-25/081-82 || Construction of Pipeline Works at Shitganga-6 ,Arghakhanchi (Est Amt NRs. 959776.71)
IFB No : WIDDARG/SQ-26/081-82 || Construction of Canal & Canal Structure Works at Sandhikharka-12 Arghakhanchi (Est Amt NRs. 479512.80)
IFB No : WIDDARG/SQ-27/081-82 || Construction of Gabion Revetment Works at Shitganga-9, Arghakhanchi (Est Amt NRs. 959444.97)
IFB No : WIDDARG/SQ-28/081-82 || Construction of Canal & Canal Structure Works at Panini-1 Arghakhanchi (Est Amt NRs. 479465.35)
IFB No : WIDDARG/SQ-29/081-82 || Construction of Gabion Dam Works at Bhumikasthan-7 Arghakhanchi (Est Amt NRs. 498958.04)
IFB No : WIDDARG/SQ-30/081-82 || Construction of Gabion Revetment Works at Shitganga-7,Arghakhanchi (Est Amt NRs. 959920.92)
IFB No : WIDDARG/SQ-31/081-82 || Construction of Canal & Canal Structures at Sandhikharka-10,Arghakhanchi (Est Amt NRs. 1919533.93)
Works:
IFB No : LPH-NCB-GOODS-25/2081-082 || Supply & Delivery of Different types of Chemicals/Reagents/Films and Consumables Items
Works:
IFB No : L/PPHL/NCB/GOODS-02RE/2081-082 || SUPPLY DELIVERY ANDINSTALLATION OF LABORATORY EQUIPMENTS (Bid Bond NRs. 48,900.00)
Works:
IFB No : DM/RD/NCB-27/081/82 || Bijayapur Dekhi Bhawanipur Sadak Marmat Devdaha-4, Rupandehi (Est Amt. NRs. 32,03,586.28)
Works:
IFB No : L/PHLMC/NCB/GOODS-19/2081-082 || The Procurement of Supply Delivery And Installation of Phacoemulsification Machine (Bid Bond NRs 1,20,100.00)
IFB No : L/PHLMC/NCB/GOODS-20/2081-082 || The Procurement of Supply Delivery And Installation of Digital X-Ray 500mA HF With DR System (Bid Bond NRs 2,40,100)
IFB No : L/PHLMC/NCB/GOODS-21/2081-082 || The Procurement of Supply Delivery And Installation of Portable X-Ray 100mA With DR System (Bid Bond NRs 1,80,100)
IFB No : L/PHLMC/NCB/GOODS-22/2081-082 || The Procurement of Supply Delivery And Installation of Panchakarma Equipment (Bid Bond NRs 28,900)
IFB No : L/PHLMC/NCB/GOODS-23/2081-082 || The Procurement of Rural Portable USG Machine (Bid Bond NRs 4,17,700)
IFB No : L/PHLMC/NCB/GOODS-24/2081-082 || The Procurement of Supply Delivery of Spares Parts of Medical Equipments (Bid Bond NRs 48,100)
Works:
IFB NO : GGM/WORKS/NCB/ 08/2081/82 || Kedareshwor Aavi two storey four room school building construction Work(EST AMT 98,27,120.54/- )
IFB NO : GGM/WORKS/NCB/09/2081/82 || Kaalika Mavi two storey four room school building construction works (EST AMT 98,27,120.54/-)
IFB NO : GGM/WORKS/NCB/10/2081/82 Janajagriti Aavi two storey four room school building construction works(EST AMT 98,27,120.54/-)
IFB NO : GGM/WORKS/NCB/ 11/2081/82 || four room school building construction works Saraswati Mavi two storey(EST AMT 98,27,120.54/-)
Works:
Civil construction work at Kathmandu
Works:
IFB NO : NPHQ/CB/NCB/2081-082/03 || Open Source Intelligence Platform (Bid sec. amt. 352000.00)
Works:
IFB NO : UDBO/ROLPA/NCB/WORKS /22 -2081/82 || Construction of DahabanCommunity Building for Collection and Storage of LocalProduce (including, Timur, ginger,Envelope turmeric, herbs) Rolpa. EST AMT 5991286.79
IFB NO : UDBO/ROLPA/NCB/WORKS /23-2081/82 || Construction of Sisne Putha Community Study Center, Sisne-6, Rukum.. EST AMT4279654.16
IFB NO : UDBO/ROLPA/NCB/WORKS /24-2081/82 || Ratamata Hasiaya Udhin to Jadebhirakuna Settlement Development, Lungri-4, Rolpa. Re. . EST AMT 1713252.10
IFB NO : UDBO/ROLPA/NCB/WORKS /26-2081/82 || Sulichour and Ruinibang Integrated urban development, Sunilsmriti 3 and 4. Re. EST AMT. 1713270.77
IFB NO : UDBO/ROLPA/NCB/WORKS /27-2081/82 || Tak Gaun model settlement development Puthautarganga 10, Rukumeast. Re. EST AMT. 1287015.41
IFB NO : UDBO/ROLPA/NCB/WORKS /28-2081/82 || Construction of MorabangCommunity Building, Bhume-RM-3, Rukum East.. EST AMT1714598.39
IFB NO : UDBO/ROLPA/NCB/WORKS /29-2081/82 || Construction of Lakhar Community Building, Bhume-RM-9, Chunwang, Rukum East. EST AMT. 1714574.05
IFB NO : UDBO/ROLPA/NCB/WORKS /30-2081/82 || Construction of Building With Physiotherapy, Lab Apdhalin atRolpa Hospital, RM-2, Rolpa. . EST AMT 1713458.84
IFB NO : UDBO/ROLPA/NCB/WORKS /31-2081/82 || Construction of Community Building for Collection and Storage of Local Produces, Runtigadi-5, Rolpa.. EST AMT 1713701.12
IFB NO : UDBO/ROLPA/NCB/WORKS /32-2081/82 || Complete The Remaining Works of Water Resource and Irrigation Development Division Office, Rolpa. EST AMT. 1400872.92
Works:
IFB No : RRM/ILAM/NCB/WORKS/2081/082-09 || Digo dadak yojana rong 1&2 (Est Amt NRs 8247358.11)
IFB No : RRM/ILAM/NCB/WORKS/2081/082-10 || Digo bikash sadak yojana rong -5 (Est Amt NRs 2684860.40)
IFB No : RRM/ILAM/NCB/WORKS/2081/082-11 || Digo sadak bikash yojana rong - 6 (Est Amt NRs 6892829.65)
IFB No : RRM/ILAM/NCB/WORKS/2081/082-12 || Piure sadak yojana rong-4 Ilam (Est Amt NRs 2279739.41)
IFB No : RRM/ILAM/NCB/WORKS/2081/082-13 || Digo sadak bikash yojana rong -3 & 4 (Est Amt NRs 6303539.33)
Works:
IFB NO : WSSDO/ KAILALI/NCB/ GOODS/03/2081-82 || Supply and Delivery of HDPE Pipe (PE-100) (Confirming to NS 40:2079) for Various Water Supply Projects of Kailali and Kanchanpur District (Est amt. 17677357.32)
IFB NO : WSSDO/KAILALI/NCB/GOODS/04/2081-82 || Supply and Delivery of GI Pipe, Miscellaneous Fittings, and Other Items. (Est amt. 17683691.00
IFB NO : WSSDO/KAILALI/NCB/WORKS/05/2081-82 || Drilling and Installation 250/200 mm diameter Deep Tube Wells for Various Water Supply Projects (Est amt. 13450802.03)
Works:
IFB NO : FUDBCO/Surkhet/Work /NCB/37/081/28 || Construction of Field and Boundary of Shibasankar Ma. Bi. Jagatipur School Jajarkot District (EST AMT 85,58,431.37 )
IFB NO : FUDBCO/Surkhet/Work /NCB/38/081/28 || Construction of Stadium at Bheri Municipality 1 Kalegaun Jajarkot District (EST AMT 1,28,31,400.58)
IFB NO : FUDBCO/Surkhet/Work /NCB/39/081/28 || Construction of Baal Helpline and Chef House Building at Narayan Municipality 1 Dailekh District (EST AMT 83,87,970.28)
IFB NO : FUDBCO/Surkhet/Work /NCB/40/081/28 || Upgradation of Road from Patikalna Pipalgauda Chinegaun Siraul at Bindra- saini Municipality-4 Dailekh District (EST AMT 85,09,094.82 )
IFB NO : FUDBCO/Surkhet/Work /NCB/41/081/28 || Upgradation of Road from Daha Singha- sain layapatal Kilohanna Kalikot Sadak Athabis Municipality Dailekh District (EST AMT 85,08,894.14)
IFB NO : FUDBCO/Surkhet/Work /NCB/42/081/28 || Construction of Health Unit Building with Birthing Centre at Chhedagad Municipality Managhat Jajarkot District (EST AMT 85,46,839.30 )
IFB NO : FUDBCO/Surkhet/Work /NCB/43/081/82 || Construction of Krishi Samagri Sankalan Tatha Chisyan Kentra Bhawan Sibalaya Rural Municipality-1, Jajarkot District (EST AMT 1,28,43,377.41 )
Works:
IFB NO : TU/MMAMC/MORANG-GOODS-01/081/082 || Procurement For Goods of Joint Desk Bench And Teacher's Podium For Proposed BBA Programme At North East Building
IFB NO : TU/MMAMC/MORANG- GOODS-02/081/082
Works:
IFB NO : IDONUWAKOT/W/NCB/06/2081-82 || Construction of Saptang Khola Pul, Kispang-04, Nuwakot (Bid sec. amt. 1.7m)
IFB NO : IDONUWAKOT/ W/NCB/07/ 2081-82 || Periodic maintenance Trishuli (Colony)-Sole-Manakamana-Kahule-Bhalche-Salme-Kimtang- Dangsing Sadak (Bhainse-Sole-Saatdobato Khanda), Kispang Ga.Pa., Nuwakot (Bid sec. amt. 3.5 Million/-)
IFB NO : IDONUWAKOT/W/NCB/08/2081-82 || Bandre Bogatigaun Dandagaun Sadak, Bidur, Nuwakot (Est amt. 96,57,450.35)
Works:
IFB NO : CHPP- 2081/82-CW-02 || Fencing works of Peaking Pond of Chilime Hydropower Plant at Thambuchet, Rasuwa
IFB NO : CHPP-2 2081/82-CW-03 || Protection Work oF Powerhouse Portalyard at Syafrubeshi, Rasuwa
IFB NO :CHPP-2081/82-MW-04 || Supply, Delivery, Testing and Commissioning of Low Goods/1S1E Vacuum Dehydration Machine
IFB NO : CHPP- 2081/82-MW-04 || Supply, Delivery, Installation, Testing & Commissioning of EOT Crane at Chilime Hydropower Plant, Syafrubensi, Rasuwa
IFB NO : CHPP- 2081/82-CW-01 || Bemdang Diversion, Syphon & Desander at Thambuchet, Rasuwa,
Works:
IFB NO : ICB/DCSD-081/82-04 || 'Supply and Delivery of Steel Tubular Poles'
Works:
IFB NO : GWRIDD/NCB/81/82-05 || Construction of 8/8" dia. Deep Tubewell, Triyuga Na.Pa. 4 and Powerdrill tubewell Triyuga Na.Pa. 13 andChoudandigadhi Na.Pa.7, Udayapur.(EST NO 3888244.69)
IFB NO : GWRIDD/NCB/81/82-06 || Construction of 8/8" dia. 180m depth (2 Nos.) Deep Tubewell, Dharan-8, Sunsari(EST NO 6405064.38)
IFB NO : GWRIDD/NCB/81/82-07 || 11 KVA Electrification work with supply and installation of 25 KVA Distribution Transformer, Choudandigadhi Na.Pa.-3 and 4, Udayapur(EST NO .5798452.65)
IFB NO : GWRIDD/NCB/81/82-08 || Supply and Installation of Submersible pump and accessories, Choudandigadhi Na.Pa. 3 and 4, Udayapur.(EST NO 3798316.78)
IFB NO : GWRIDD/NCB/81/82-09 || Supply and Installation of Submersible pump and accessories, Mechinagar Na.Pa. 2 and 4, Jhapa(EST NO 3058803.18)
IFB NO : GWRIDD/NCB/81/82-10 || . 11 KVA Electrification work with supply and installation of 25 KVA Distribution Transformer, Mechinagar Na.Pa.-2 and 4, Jhapa(EST NO 4870989.76)
IFB NO : GWRIDD/NCB/81/82-11 || Construction of pump house and overhead tank with distribution system, Choudandigadhi Na.Pa. 3 and 4, Udayapur (package-1) (EST NO 7775826.49)
IFB NO : GWRIDD/NCB/81/82-12 || Construction of pump house with distribution system, Choudandigadhi Na.Pa.4, Udapur(Package-2). (EST NO 10495805.890
IFB NO : GWRIDD/NCB/81/82-13 || Construction of pump house and overhead tank with distribution System, Mechinagar Na.Pa. 2 and 4, Jhapa.
(EST NO 15414434.96 )
Works:
IFB NO : WRIDDB/NCB/MKRTW/18/081-82 || Construction of Embankment and River Training Structures at Left Bank of Maan Khola at different locations in Banke
IFB NO : WRIDDB/NCB/MRRTW/19/081-82
IFB NO : WRIDDB/SQ/MNRT/28/081-82
Works:
IFB NO : FUDBC/ Morang/NCB/ Works/74-2081-082 || Construction of Basghara Building at Itahari Sub Metropolitan city Ward no 5, Sunsari. (Est amt. 85,63,097.10)
IFB NO : FUDBC/ 2. Morang/NCB/ Works/75-2081-082 || Construction of Hospital Ward for Purbanchal University Hospital, Sundarharaicha Na. Pa. 8, Gothgaun, Morang. (Est amt. 85,62,234.58)
Works:
IFB NO : LIDPO/Htd/IFB/Works/03/081-82 || Construction of the road
Works:
IFB NO : NSC/NCB/SSLG/04/081/82 || Supply and Delivery of Sports Science lab Goods in National Sports Council ( Bid Security NRs. 11,00,000.00)
Works:
NCB/Dhangadhi/FWCV/09/81/82") || Construction of FINISHING WORK OF COVERED HALL (EST AMT 2,90,000.00 )
Works:
IFB No : LIDPOITH/NCB/W/2081-082/115 || Construction and Upgrading of Sundari chauk janjati chauk chautara sadak kalopatre,Miklajung gaa paa-3,6 Morang,
IFB No : LIDPOITH/NCB/W/2081-082/116 || Construction/Upgrading of Murkuchi-Puware-Sukaura Sadak Ruatamai Ga. Pa. 7, Udaypur
Works:
IFB No : 13/NCB/GOODS/GABIN/KPLRM/2081-82 || Procurement and Transporta-tion of Gabion Box (Est Amt NRs. 88,49,095.44)
Works:
IFB NO : 1 / GOODS/IT/NCB/BM/081/82 || Laptop and computer items purchase and AC installation for Bhimad Municipality (Bid sec. amt. 60000.00)
IFB NO : 1/GOODS/AGRI/NCB/BM/081/82 || Procurement of Agricultural machinery (Bid sec. amt. 115000.00)
Works:
IFB No : IWRMO-NC Works -03-081/82 || River Training work at Aabukhaireni Mandir Parisar, Aabukhaireni, Tanahu (Est Amt NRs. 1,21,09,195.62)
Works:
IFB NO : 05/RDDKT/33701138/081/82/24 || Road Maintenance works at Leguwaghat to Kewabesi road (Ch.109+860+116+860), Dhankuta
( EST AMT 1,690,388.3)
IFB NO : 05/RDDKT/33701138/081/82/25 || Emergency Road & Bridge work at Midhill highway Tamor River - road Section NH-03, Protection Sankranti Terahthum( EST AMT 5968329.31
IFB NO : 05/RDDKT/33701138/081/82/26 || Upgradation works of Thalthale Paharepani Bharibande Road Dhankuta( EST AMT 2560775.99)
IFB NO : 05/RDDKT/33701138/081/82/27 || Upgradation works of Morang Kerabari Sammeba Dhankuta Kaajiname Chhathar Jorpati Jitpur Dadagaun Maamling Sankhuwasabha road. (Ch 0+000 to 12+475 section) ( EST AMT 5447660.0 )
IFB NO : 05/RDDKT/33701138/081/82/28 || Road & Bridgeprotection and maintenance works along KRM Bhedetar-Patlekhola-Hile section NH-08. Dhankuta( EST AMT 5152483.17)
Works:
IFB NO : NARC/DOAR/ SQ/Works SQ No.04/081/082 || Construction of 8/6" Deep Tube well Including well Development (Bid sec. amt. 58000.00)
IFB NO : NARC/DOAR/ NCB/Works NCBNo 02/081-82 || Construction of Lift Irrigation System from Bheri Revier (Bid sec. amt. 115910.0)
Works:
IFB No :SN/SOMC/NCB/o८/२०८१/०८२ || मोटरसाइकल खरिद कार्य || अनुमानित लागत रू. ३० लाख
Works:
IFB NO : NCB/MMO/24/2081-82 || Construction of Culvert in Madi Municipality Ward no.1.2.7. (Est amt. 71,74,521.23)
Works:
IFB No : DUDBC/FPIU/Rupandehi/Works/NCB/65/081/82 || Integrated urban infrastructure development work in Sitganga Municipality, Arghakhanchi under Intensive Urban
Development Programme ( Bid Security Amount (NRs) 12,00,000.00)
Works:
IFB NO : BAGMUN/BAG/NCB/Works/081-82-08 || Upgrading and Maintenance of Various roads of Baglung Municipality (Est amt. 10384156.63)
Works:
IFB No : MRM/NCB/REVENUE/081-82/03(RE-02) || न्यूनतम रकम कर बाहेक NRs ३५,८८,५५०.६०
IFB No : MRM/NCB/REVENUE/081-82/05(RE-02) || न्यूनतम रकम कर बाहेक NRs १०,१९,७९५.०२
Works:
IFB NO : NWSCBANEPA/ WORKS/CDT/01-2081/082 || Construction work of 200*150mm dia 220 meter Deep Tube Well by DTH method at Dhaneshwor (Est amt. 38747558.46)
Works:
IFB NO : UDBO/BANKE/NCB/WORK/BADIMAHILA.BLG/081-082/37 ||
Construction of FF Badi Mahila Sanrakshan, Sambardhan Tatha Bahu Uddesiya Building at Nepalgunj-13, Bank (EST AMT 3999979.57)
IFB NO : UDBO/BANKE/NCB/WORK/BADIMAHILA.BLG/081-082/38 ||Construction of R.C.C Drain Works (A) From Idagah to Bhawaniyapur Pool Nepalgunj-14, Banke, (B) From Sabha Hall Main road to Idagah Nepalgunj-14, Banke (EST AMT 5999410.37)
IFB NO : UDBO/BANKE/NCB/WORK/BADIMAHILA.BLG/081-082/39 ||Construction of RCC Drain at Nepalgunj -17 Paraspur, Banke (EST AMT 2999034.02)
IFB NO : UDBO/BANKE/NCB/WORK/BADIMAHILA.BLG/081-082/40 || Construction and Finishing work of Samudayik Ayueved and Prakritik Hospital Building at Kohalpur-2 Banke (EST AMT 7499618.18)
IFB NO : UDBO/BANKE/NCB/WORK/BADIMAHILA.BLG/081-082/31 || Constraction of Box Culvert at Nepalgunj-20,Potedarpur Banke (EST AMT 1499905.4 )
IFB NO : UDBO/BANKE/NCB/WORK/BADIMAHILA.BLG/081-082/42 ||Construction of Ground Floor in Jestha Nagarik Bhawan Bansgadhi-4, Bardiya and Construction of juktinagar Samudayak Building at Badhaiyatal-9 Juktinagar, (EST AMT 1999190.67)
IFB NO : UDBO/BANKE/NCB/WORK/BADIMAHILA.BLG/081-082/43| Construction of Earthen Drain and Upgradation Bardiya of Road at Bansgadhi-9 Paraspur Konaithi, Bardiya (EST AMT 999740.26)
IFB NO : UDBO/BANKE/NCB/WORK/BADIMAHILA.BLG/081-082/44 ||Construction of Kusmadevi Aa.Bi Boundary Wall at Barbaardiya-4, Ranipur (EST AMT 999887.43)
IFB NO : UDBO/BANKE/NCB/WORK/BADIMAHILA.BLG/081-082/41 ||Ghorpitta BardiyaMaintenance of Sahid Smriti Pratisthan Bhauwan, Madhuwan-6 Bardiya (EST AMT 1999863.31)
IFB NO : UDBO/BANKE/NCB/WORK/BADIMAHILA.BLG/081-082/42 || Upgradation of Road at Daulatpur Chowk to Pipalchautra Rajapur-1 Bardiya (EST AMT999740.82)
IFB NO : UDBO/BANKE/NCB/WORK/BADIMAHILA.BLG/081-082/43 ||Construction of Primix Widening Works at Thakurbaba-1 Dumreni, Bardiya (EST AMT 1999902.84)
IFB NO : UDBO/BANKE/NCB/WORK/BADIMAHILA.BLG/081-082/44 ||Upgradation of Road at Chitkaiya Khalla, Thakurbaba-8 Bardiya
(EST AMT999600.24)
IFB NO : UDBO/BANKE/NCB/WORK/BADIMAHILA.BLG/081-082/45 ||Construction of RCC Drain at E Gau Sher bahadur B,C house to South, Khajura-4, Banke (EST AMT 999900.14)
IFB NO : UDBO/BANKE/NCB/WORK/BADIMAHILA.BLG/081-082/46 ||Construction of RCC Drain from Channahuwa Gohawa to North Khelkud Maidan at Kohalpur-15 and Upgradation of Road from Ganesh Tol to Nepalgunj Highway at Kohalpur-9, Banke (EST AMT 1999331.24)
IFB NO : UDBO/BANKE/NCB/WORK/BADIMAHILA.BLG/081-082/47 ||Construction of RCC Drain at Krishi Hat Bajar Dekhi Uttar Jal Mausam Bigyan Karyalay Kohalpur-2 and Construction of Humpipe Culvert and Upgradation of Road at Khumbu Dragon Fruit Farm Narayanpur basti bikas Baijanath-3, Banke (EST AMT 1999523.64)
IFB NO : UDBO/BANKE/NCB/WORK/BADIMAHILA.BLG/081-082/48 ||Construction of R.C.C. Drain at Narainapur-1Katkuiya and Construction of R.C.C. Drain at Narainapur-2 Gangapur, Banke (EST AMT1999772.14)
IFB NO : UDBO/BANKE/NCB/WORK/BADIMAHILA.BLG/081-082/49 Construction of R.C.C. Drain at Narainapur-4Nausara Gaun and Construction of R.C.C. Drain at Narainapur-6 Budhdha Chowk, Banke (EST AMT1999822.08)
IFB NO : UDBO/BANKE/NCB/WORK/BADIMAHILA.BLG/081-082/50Construction of PCC Road at Naya Basti Bikash, Nepalgunj-9, andConstruction of PCC Road From saimatha To Bhattha Toll Nepalgunj-5, Banke (EST AMT1999484.89 )
IFB NO : UDBO/BANKE/NCB/WORK/BADIMAHILA.BLG/081-082/51 Construction of RCC Drain at Nepalgunj-6 Lal Singh House to North East and Ugradation of Road at Duduwa-1 Kuduwa, Banke. (EST AMT 1999677.41)
IFB NO : UDBO/BANKE/NCB/WORK/BADIMAHILA.BLG/081-082/52 Construction of Boundary wall Sahawa Samudayik Bhawan Nepalgunj-9 & Construction of plum concrete and Boundry wall at
kabrastan Dudwa-3 Banke. (EST AMT 1998911.25)