IFB NO : JSMC/NCB/WORKS/7-2081/82 || Upgrading Of Road
IFB NO ; JSMC/NCB/WORKS/6-2081/82 ||| Upgrading Of Gravel Road
IFB NO : JSMC/NCB/WORKS/4-2081/82 || Construction Of Blacktopped Road And Drain
IFB NO : JSMC/NCB/WORKS/3-2081/82 || Construction Of Blackedtopped Road
IFB NO ; 04/RDTLR/081/082-VI ||| Slope Stabilisation Works Including Plum and gabion works along Leguwaghat-Bhojpur Road Section(NH03)
IFB NO ; 04/RDTLR/081/082-V || Track Opening Along Hamtok-Tamalung-Samke Sadak ,Ramprasadrai Ga.Pa., Bhojpur
IFB NO ; 04/RDTLR/081/082-IV || Upgrading of road with premix blacktop works along Saalabisauna Gumma Mathillo Tumlingtar Sadak,Sankhuwasabha
IFB NO : UGC-BLDG-NCB-BUIA&B-01-081-082 ||| construction of academic Block A & B & Common Toilet Construction work of Dudhiawa Campus at Fatuwa Bijaypur Municipality:-10, Rautahat
IFB NO ": NCB/DKRM/W-03/081/082 || Construction of Khochlek Sittad Rim Dilasaini Sadak
IFB NO : DAO/DOP/NCB/W/01/081/082 || Building Construction.
IFB NO : 04/RDTLR/081/082-III || Rehabilitation Works including gabion works along Bhojpur-Chakhewa Road Section(NH03)
IFB NO ; 04/RDTLR/081/082/II || Road Side Slope Stabilisation Works In Tiwaribhanjyang, Leguwaghat- Bhojpur Road Section(NH03)
IFB NO : BM/NCB/W/B/02/2081-82 || Construction of myagdi jilla beni na.pa. ratnechaur param baudik sanatan dharmik aashram mandir parisar sudhar and param bhaudik dharmik sanatan aashram shree laxmihari mandir purwadhar beni na pa 1
IFB NO : L/PPHL/NCB/GOODS-02/2081-082 ||| SUPPLY DELIVERY AND INSTALLATION OF LABORATORY EQUIPMENTS SLICE A (HISTOPATHOLOGY LAB EQUIPMENTS) Bid Security Fee Nrs.4,44,900/- SLICE B (CYTOLOGY LAB EQUIPMENTS) Bid Security Fee Nrs.48,900/-
IFB NO ; BNP/WORKS/9/2081/82 || Cold Store Nirman
IFB NO ; BNP/WORKS/9/2081/82 || Cold Store Nirman
IFB NO : MRM-09-2081/082 || Revenue Collection of River Bed Materials of Majuwatar Ghat,Myagde-5
IFB NO ; JSMC/NCB/WORKS/2-2081/82 || Construction Of Drain And Road
IFB NO : SDOLALITPUR/NCB/01/2081-82 || Construction of Sahid Smarak College Building, Kirtipur Municipality-10, Kathmandu
IFB NO ; JSMC/NCB/WORKS/1-2081/82 || Construction Of Blacktopped Road And Culvert
IFB NO : BRM/NCB/BUILDING/WORKS/DOLAKHA/03/2081/82 || This project include all finishing works of school building from foundation to final.
IFB NO : BRM/NCB/BUILDING/WORKS/DOLAKHA/03/2081/82 || This project include all finishing works of school building from foundation to final.
IFB NO : SMP/081-82/NCB/BG/21 || building construction
IFB NO : SMP/081-82/NCB/BG/20 || building construction
IFB NO ; NCB/BM/Works/81-82/33 || Sital tole and Mahakali Tole Road Upgrading works
IFB NO : NCB/BM/Works/80-81/31 || Drain Construction work at different place of ward no.-1 (Nagar level)
IFB NO : NCB/BM/Works/81-82/30 ||Road Upgrading works at Saraswoti tol, Gandaki tol,Karnali Rajmarg South,Gautam tol of Birendranagar-3 ,surkhet
IFB NO : NCB/BM/Works/81-82/30 ||Road Upgrading works at Saraswoti tol, Gandaki tol,Karnali Rajmarg South,Gautam tol of Birendranagar-3 ,surkhet
IFB NO :" NCB/BM/Works/81-82/28 || Road Upgrading works from Haridilbhumi to Siddartha margh and Fulbari Tole
IFB NO :" NCB/BM/Works/81-82/28 || Road Upgrading works from Haridilbhumi to Siddartha margh and Fulbari Tole
IFB NO ; NCB/BM/Works/81-82/28 || Road Upgrading works from Haridilbhumi to Siddartha margh and Fulbari Tole
IFB NO : NCB/WORKS/LPKRM/2081/82-04 || Procurement of Kinja Bhakanje Lamjura Road (Bhakanje-Lamjura Section) Upgrading Work
IFB NO : WRMP-KASKI/SETIBENI-PARBAT/NCB/WORKS/11/081-082 ||Construction of Setibeni Tatbandh Nirman Karya 9,111,421.31
IFB NO : WRMP-KASKI/SODHA-MADI-KASKI/NCB/WORKS/12/081-082 || Construction Works of Sodha Madi Tatbandh 8,427,582.38
IFB NO ; URM/NCB/Works/04-2081/82 || Construction and Upgrading of Nepaltar-Udayapurgadhi Darbar Sadak Blacktop ( Chainage 0+000 to 4+000 Km) works of Asphalt Concrete with structures
IFB NO : MM/ACH/NCB/WORKS-05/2081-082 ||
Mangalsen Khelmaidan Purvadhar Nirman, Mangalsen-05, Achham
IFB NO : RDTLR/33701012/ 081/082-26(re) || Construction Of Truss
Works, Plumbing Works in Office Premises of RD,Tumlingtar 11,39,341.27
IFB NO : RDTLR/337310113/081/082-27 || Road Side Slope Stabilisation
Works In Tiwaribhanjyang. Leguwaghat- Bhojpur Road Section(NH03)
IFB NO : RDTLR/337310113/081/082-28 || Rehabilitation Works including gabion works along Bhojpur-Chakhewa Road Section(NH03) 40,49,433.44
IFB NO : RDTLR/337310113/081/082-29 || Upgrading of road with premix blacktop works along Saalabisauna Gumma Mathillo Tumlingtar Sadak,Sankhuwasabha 34,21,329.76
IFB NO : RDTLR/337310113/081/082-30 || Track Opening Along Hamtok-Tamalung-Samke Sadak, RamprasadRai Ga.Pa., Bhojpur 34,17,783.94
IFB NO : RDTLR/33701138/081/082-31 || Slope Stabilisation Works Including Plum and gabion works along Leguwaghat-Bhojpur Road Section(NH03)
78,58,668.22
IFB NO ; MM/ACH/NCB/WORKS-05/2081-082 || Mangalsen Khelmaidan Purvadhar Nirman, Mangalsen-05, Achham
IFB NO : IMEP/RIP/B-1a/CW-118 || Construction of main, branch and Secondary canal structures and Rehabilitation of Geruwa kulo intakes of Rajapur Irrigation
IFB NO : IMEP/RIP/B-1a/CW-117 || Repair of Budi Kulo approach channel, Upgrading Budi Kulo Intake and Karnali River protection of Rajapur Irrigation Project
IFB NO : IMEP/RIP/B-1a/CW-117 || Repair of Budi Kulo approach channel, Upgrading Budi Kulo Intake and Karnali River protection of Rajapur Irrigation Project
IFB NO : TRM/IFB-10/R/081/82 || road improvement works along with lanslide protection.
IFB NO : TRM/IFB-05/R/081/82 || ward number 2
IFB NO ; SGNHC/ICB/081/82/33 || Supply And Delivery Of PTMC Balloon
IFB NO ; SGNHC/ICB/081/82/33 || Supply And Delivery Of PTMC Balloon
© Copyright Thekkabazar. All Rights Reserved