IFB NO ;JSMC/NCB/WORKS/8-2081/82 || Construction Of Flexible Pavement Road
IFB NO ;JSMC/NCB/WORKS/8-2081/82 || Construction Of Flexible Pavement Road
IFB NO : JSMC/NCB/WORKS/6-2081/82 || Upgrading Of Gravel Road
IFB NO ; JSMC/NCB/WORKS/5-2081/82 || Construction Of Blackedtopped Road
IFB NO : 02-AKC-TK-2081/2082 || Seeds at Kapilvastu
IFB NO : URL-hattbazar-Ward3-W-NCB-05-081/82 || Construction of Krishi haat bazar of Chandane & Manglabare bazar, Urlabari-3
IFB NO ; Bhjmun/W/NCB/12-2081/82 || Bhojpur Ward No. 1 Aadharbhut Swasthya Chauki Marmat & Sakela Park Nirman Bhojpur 1 Bhojpur
IFB NO ; Bhjmun/W/NCB/12-2081/82 || Bhojpur Ward No. 1 Aadharbhut Swasthya Chauki Marmat & Sakela Park Nirman Bhojpur 1 Bhojpur
IFB NO : DM/BLD/NCB-16/081/82 || Shankar Aadharbhut Bidhyalaya
Purwadhar Nirman Devdaha-11 Rupandehi 26,69,066,61
IFB NO : DM/BLD/NCB-17/081/82 || Pragati Ma. Vi. Sabha Hall Nirman Devdaha-12, Rupandehi 38,93,367.62
IFB NO : DM/BLD/NCB-18/081/82 || Ward No I Ko Sabha Hallmat Compound
Wall Devdaha 11 Ward Karyalaya Compound Wall Nirman, Devdaha 1 & 11, Rupandehi 38,18,417.02
IFB NO : DM/RD/NCB-19/081/82 || Singha Culvert Dekhi Ward 8 Buddha Technical Campus Hudai Pakari Jane Bato Devdaha-8, Rupandehi 33,22,122.09
IFB NO ; 27-BMC/081/082/G/NCB/51 || Procurement of Ayurvedic Medicines for FY 2081/82, BMC
IFB NO : LMC-NCB-WORKS-2081/82-04 || Mahalaxmi Bhainsepati Motorable Bridge Maintenance Works
IFB NO ; LMC-NCB-WORKS-2081/82-03 || Construction of Karmanasa River Box Culvert
IFB NO : JSMC/NCB/WORKS/10-2081/82 || Construction Of Drain And Retaining
IFB NO : LIDPO/PKR/IFB/WORKS/11/081-82-131 || Construction/Upgrading of i)Akle Pipal -Dhanubas-Bharuwa- Raskhola- Thapadada sadak ii)Chhapa- Kaule- Chandrakot Sadak iii)Satau -Darau sadak iv)Surkaudi-Dauwa-Sworek -Maidan Sadak v)Arjunchaupari Ga.Pa(prashasakiyabhawan) Kulenachaupari Narabhanjyang sadak
IFB NO : LMC-NCB-WORKS-2081/82-02 || Construction of Fencing Works in Different Places of Lalitpur
IFB NO: LMC-NCB-WORKS-2081/82-02 || Construction of Fencing Works in Different Places of Lalitpur
IFB NO : LIDPO/PKR/IFB/WORKS/11/081-82-128 || Construction/Upgrading of i) Bagrebazar- Koldada- Lamdada- Dhapuk Parbat sadak ii) Bagarebazar- Pakaan Ga.Pa. Waling sadak iii) Sundar Bazar- Sundarchaur -Chiurikharka sadak starounnati iv) Bagarebazar- Pakaan- Dauwa-Waling sadak v) Bayarghari -Mohandada -Thuli Bhanjyang- Parbat Huwas sadak
IFB NO ; LIDPO/PKR/IFB/WORKS/11/081-82-127 || Construction/Upgrading of i) Waling Na.Pa-9, Bhumar Puchaar - Ambot Pathkhola - Siddrtha Rajmarga - Sadak ,Syangja ii) Waling Na.Pa-9, Bhumar Puchaar - Ambot Pathkhola- Siddrtha Rajmarga Sadak Starunnati, Syangja iii) Modikhola -Bajhakot- Dangsing- Tindobate -Pathkhola Sadak Starounnati -Waling
IFB NO : JSMC/NCB/WORKS/8-2081/82 || Construction Of Flexible Pavement Road
IFB NO : JSMC/NCB/WORKS/7-2081/82 || Upgrading Of Road
IFB NO ; JSMC/NCB/WORKS/6-2081/82 ||| Upgrading Of Gravel Road
IFB NO : JSMC/NCB/WORKS/4-2081/82 || Construction Of Blacktopped Road And Drain
IFB NO : JSMC/NCB/WORKS/3-2081/82 || Construction Of Blackedtopped Road
IFB NO ; 04/RDTLR/081/082-VI ||| Slope Stabilisation Works Including Plum and gabion works along Leguwaghat-Bhojpur Road Section(NH03)
IFB NO ; 04/RDTLR/081/082-V || Track Opening Along Hamtok-Tamalung-Samke Sadak ,Ramprasadrai Ga.Pa., Bhojpur
IFB NO ; 04/RDTLR/081/082-IV || Upgrading of road with premix blacktop works along Saalabisauna Gumma Mathillo Tumlingtar Sadak,Sankhuwasabha
IFB NO : UGC-BLDG-NCB-BUIA&B-01-081-082 ||| construction of academic Block A & B & Common Toilet Construction work of Dudhiawa Campus at Fatuwa Bijaypur Municipality:-10, Rautahat
IFB NO ": NCB/DKRM/W-03/081/082 || Construction of Khochlek Sittad Rim Dilasaini Sadak
IFB NO : DAO/DOP/NCB/W/01/081/082 || Building Construction.
IFB NO : 04/RDTLR/081/082-III || Rehabilitation Works including gabion works along Bhojpur-Chakhewa Road Section(NH03)
IFB NO ; 04/RDTLR/081/082/II || Road Side Slope Stabilisation Works In Tiwaribhanjyang, Leguwaghat- Bhojpur Road Section(NH03)
IFB NO : BM/NCB/W/B/02/2081-82 || Construction of myagdi jilla beni na.pa. ratnechaur param baudik sanatan dharmik aashram mandir parisar sudhar and param bhaudik dharmik sanatan aashram shree laxmihari mandir purwadhar beni na pa 1
IFB NO : L/PPHL/NCB/GOODS-02/2081-082 ||| SUPPLY DELIVERY AND INSTALLATION OF LABORATORY EQUIPMENTS SLICE A (HISTOPATHOLOGY LAB EQUIPMENTS) Bid Security Fee Nrs.4,44,900/- SLICE B (CYTOLOGY LAB EQUIPMENTS) Bid Security Fee Nrs.48,900/-
IFB NO ; BNP/WORKS/9/2081/82 || Cold Store Nirman
IFB NO ; BNP/WORKS/9/2081/82 || Cold Store Nirman
IFB NO : MRM-09-2081/082 || Revenue Collection of River Bed Materials of Majuwatar Ghat,Myagde-5
IFB NO ; JSMC/NCB/WORKS/2-2081/82 || Construction Of Drain And Road
IFB NO : SDOLALITPUR/NCB/01/2081-82 || Construction of Sahid Smarak College Building, Kirtipur Municipality-10, Kathmandu
IFB NO ; JSMC/NCB/WORKS/1-2081/82 || Construction Of Blacktopped Road And Culvert
IFB NO : BRM/NCB/BUILDING/WORKS/DOLAKHA/03/2081/82 || This project include all finishing works of school building from foundation to final.
IFB NO : BRM/NCB/BUILDING/WORKS/DOLAKHA/03/2081/82 || This project include all finishing works of school building from foundation to final.
IFB NO : SMP/081-82/NCB/BG/21 || building construction
IFB NO : SMP/081-82/NCB/BG/20 || building construction
IFB NO ; NCB/BM/Works/81-82/33 || Sital tole and Mahakali Tole Road Upgrading works
IFB NO : NCB/BM/Works/80-81/31 || Drain Construction work at different place of ward no.-1 (Nagar level)
IFB NO : NCB/BM/Works/81-82/30 ||Road Upgrading works at Saraswoti tol, Gandaki tol,Karnali Rajmarg South,Gautam tol of Birendranagar-3 ,surkhet
© Copyright Thekkabazar. All Rights Reserved