IFB NO : KM/NCB/ROAD/02/81-82 || Upgrading of Road By Black Top.
IFB NO : RMO/GHAT/NCB/09-081/082 || collection and extraction of river bed materials of Khayerbot Ghat.
IFB NO : IDO/RKM/NCB/W/2081/082/28 || Construction Of Solabang Dhaune Rukumkot Sadak Nirman
IFB NO : CRM/NCB/Works/02/081/082 || Upgrading Of Bayala Aampani Rantola Gajar Road
IFB NO : NCB/MMO/11/2081-82 || Karyalay ko Dainik prayog ma Laeene Samagri kharch Masaland karyalaya Samagri Kharid Karya
IFB NO : Gorkhapatra-G-01-NCB-2081-082 || procurement of Supply and Delivery of 3000 Liter Fountain Solution and 3000 Liter Blanket Wash
IFB NO : CRM/NCB/Works/01/081/082 || Construction Of Deurali Mauri Chaumala Road
IFB NO : RRM/ILAM/NCB/WORKS/2081/082-01 || Construction Works Of Sat No. Golai Marse Simle Sadak
IFB NO : 03/DEV/NCB/WORKS/2081-82 || Compile Black Topped& Upgrading Work Of Ring Road 4 section ( ward no 9,7&13)
IFB NO : FPIU/Dhanusha/Works/NCB/37-2081/82 || Construction of RCC Frame Structure Building of Rajarshi Janak Higher Secondary School, Kurtha, Janakpur Sub-Metropolitan City-21, Dhanusha
IFB NO : HCIL/NCB/AUC/01/081/082 || Auction Sales of Ropeway
IFB NO : 01-RRM/NCB/W/2081-082d || Construction of Rapti Ring Road (Khururiya to Goindra Khola Section)
IFB NO : (07/TRM/NCB/Works/R/2081-082) || Upgrading Works of Jalapa Gobardhantar Kalleri Road.
IFB NO : 01-RRM/NCB/W/2081-082b || Durga Himal dekhi Rastriya ma vi jane sadak and Aapkholi tol Bhalubang sadak nala starunnati
IFB NO : 01-RRM/NCB/W/2081-082b || Durga Himal dekhi Rastriya ma vi jane sadak and Aapkholi tol Bhalubang sadak nala starunnati
IFB NO : 01-RRM/NCB/W/2081-082b|| Durga Himal dekhi Rastriya ma vi jane sadak and Aapkholi tol Bhalubang sadak nala starunnati
IFB NO : DSRM/Works/NCB/081/82-08 || Tokarpur Pasewan Dekhi Darga Koilibagar Samma Sadak Starunnati
IFB NO : 01/NCB/WORKS/GRM/2081-082 || Construction Work Of Ghumaune Taal Consists of 3mlong 20mm dia Anchoring and Grouting work, M25 concrete work , Reinforcement work and others)
IFB NO : 01/RRM/NCB/W/2081-082/a || Ektanagar Sadak Starunnati
IFB NO : DSRM/Works/NCB/081/82-07 || Pasewan Baske Kholakharka Sadak Track Open
IFB NO : CIAA/Butwal/Works/NCB/01/081/82 || Construction of Boundary wall at CIAA, Butwal
IFB NO : DSRM/Works/NCB/081/82-06 || Pudighyang Teksing Sano Shailung Sadak Starunnati
IFB NO : DSRM/Works/NCB/081/82-05 || Gurase Simtar Rajamantar Sadak Starunnati
IFB NO : 01/RRM/NCB/W/2081-082 || Construction of RCC Box Culvert at Bhagwanpur
IFB NO : MRM/Myagdi/NCB/Works/04/081/082 || Brick masonary,PCC,RCC,sanitary works,electeic works,flooring etc
IFB NO : MRM/NCB/WORKS/05/081-82 || 3 No Ward Office To Gaidabaj Connection Road Maintenance Work
IFB NO : School Building Construction work of Devasthali Aa Bi Gaumul Rural Municipality Ward no 6 Sateda Bajura.
IFB NO : 04-2081/82 || Supply, Delivery, Installation, Testing, Commissioning of Electric Incinerating Machine.
IFB NO : 03-2081/82 || Supply, Delivery, Installation, Testing, Commissioning including civil works Electrical works all complete as per specifications for establishment of Electric vehicle charging station.
IFB NO : GRM/Bajura/Works/NCB/03/081-082 || Road Construction Work From Agra to ward no 2 ward office At Gaumul Rural Municipality Ward no 2 Tallodugun Bajura
IFB NO : BRM/NCB/WORKS/081/082-01 || Invitation for Bid (E-bidding) for Limsa Dhaulakot samaila sadak nirman barekot -01, jajarkot
IFB NO : MRM/NCB/WORKS/04/081-82 || Dobato To Ward office Manma Road Mahabu Ga.Pa. 02
IFB NO : MRM/NCB/WORKS/04/081-82 || Dobato To Ward office Manma Road Mahabu Ga.Pa. 02
IFB NO : Khaniyabas/NCB/works/003/2081-082 || Construction of rigid pavement on budhu gilincho road
IFB NO : Khaniyabas/NCB/works/002/2081-082 || Rigid Pavement on manechautara birchet road
IFB NO : Khaniyabas/NCB/works/002/2081-082 || Rigid Pavement on manechautara birchet road
IFB NO : KRM/NCB/GOODS/2081/82/8 || procurement of cgi sheet
IFB NO : DMG/02/Goods/NCB-081/082 || Procurement of Lapidary Equipments for Gemstone Processing Center to be delivered and installed in Surkhet
IFB NO : wssdorupandehi/NCB/Work/081-82/05 || Drilling and installation of 250x200mm diameter Deep Tubewell by Rig Machine (150m) deep for Danpur WSP, Kanchan.
IFB NO : wssdorupandehi/NCB/Work/081-82/04 || Drilling and installation of 250mm x 200mm diameter Deep Tubewell by Rig Machine (150m deep) for Mayadevi WSP, Devdaha-4
IFB NO : wssdorupandehi/NCB/Work/081-82/03 || Drilling and installation of 250x200mm diameter Deep Tubewell by Rig Machine (150m) deep for Murgiya Ganganagar WSP, Sainamaina 3
IFB NO : NITDB/NCB/C-55(2081/082) || Construction of Median Barrier in Vehicle Lane from Padam Road to Nepal Gate in Birgunj ICP
IFB NO : wssdorupandehi/NCB/Work/081-82/01 || Drilling and installation of 250x200mm diameter Deep Tubewell by Rig Machine (150m) deep for Tilottama-11 Bhulke WSP,Rupandehi
IFB NO : BGN/NCB/works/6/081/082 || RCC Pavement, Subbase and Drain Construction
IFB NO : NCB01/081/82(DTW-DG) || Construction of 200 mm. dia 110 m depth Deep Tubewell at Khairahani-09, Chitwan
IFB NO : MRM/Myagdi/NCB/Works/B/03/081/082 || PCC works, Rebar, brick works etc
IFB NO : FPIU/Dhanusha/Works/NCB/43-2081/82 || Road Upgradation and Drain Construction Works from Nepali Congress Party Office to Jalad Bridge, Janakpur Sub-Metropolitan City-4, Dhanusha.
IFB NO : 04/081/82road || Tharpu Semjong Marpak Road Upgrading Work
IFB NO : 9/BRM/NCB/2081/082 || Supply and Delivery of Firefighting Vehicle along with all required necessary accessories at Bardagoriya Rural Municipality Kailali
IFB NO : 9/BRM/NCB/2081/082 || Supply and Delivery of Firefighting Vehicle along with all required necessary accessories at Bardagoriya Rural Municipality Kailali
© Copyright Thekkabazar. All Rights Reserved