IFB No: BMC/NCB/W/01/2082/83 Complete construction of 5 classroom,2 toilet and top of staircase on the first floor including windows, doors, plastering, and coloring on the ground floor.
IFB No: BRM/NCB/BW/02/2082/83 Construction of RCC Slab. Columns on 3rd floor ( school building), , Gaurd House, Water Tank, Compound Wall with Entrance gate , All brick works, Plastering, Painting wotks etc