IFB NO : ARU/NCB/W/03/2081-82 || Aarughat-Bhanjyang-Bansbote-Tirtire Sisneri-Baluwa-Gairichhap sadak estarunnati at ARM-7 & 8.
IFB NO : ARU/NCB/W/04/2081-82 || Soti-Manbubesi-Katunje-pelchet Dhunchet Kashigaun-kerauja sadak estarunnati at ARM-1 & 2.
IFB NO : LRM/ROL/NCB/02/2081/2082 || Construction of Water supply Structures
IFB NO ; RDJKR/081-82/7-08 || Reactive maintainance works along Janakpur Parikrama Road (Dhanushadham-Baidehi Sadak Section), Dhanusha; RDJKR/337310113/081/82/Rec-94
IFB NO : RDJKR/081-82/7-07 || Gravelling Works & Drainage Works along Bisbitti Paschimbari toleko uttar tarf balba tole samm sadak janakpur Up.Ma.Na.-22, Dhanusha; RDJKR/33701169/081/82/93
IFB NO : RDJKR/081-82/7-05 ||| Road Upgrading Works along Lakhauri Railway Laien dekhi Kaptaul- Jhitkohiya-Madhukadhi Gadahiya- Belhi Samm Ko sadak Dhanusha; RDJKR/33701169/081/82/91
IFB NO ; RDJKR/081-82/7-02 || Highway Lighting and Electrification Works along Dhalkevar Janakpur Jatahi NH 22 in Dhanusha District; RDJKR/33701130/081/82/88
IFB NO : RDJKR/081-82/7-01 || Road Upgrading Works of Janakpur Ring Road (Thera – Mahuwa – Kapleshwar – Lohana Road – Rampur Road Section) in Dhanusha District; RDJKR/33701169/081/82/87
IFB NO : NRM/DDL/WORKS/NCB/03/2081-082 || Construction of Rural Municipal Level Playground Project
IFB NO : NRM/DDL/WORKS/NCB/02/2081-082 | Construction of Health Post Building
IFB NO : 08/PM/NCB/WORKS/081/82 || Ward No. 1 ko (Himalayan school dekhi malebagar jane sadak),Ward No. 3 ko (badkhola dekhi putalikhet sadak,samaghri chowk dekhi hamal dada sadak,godgode dekhi putalikhet sadak ) Ward No.14 ko(drivertole dekhi chipehattiya sadak,putalikhet pul dekhi phaat hudai jholunge pul niskine sadak ) sadakharuko patching tatha marmat karya
IFB NO : NRM/DDL/WORKS/NCB/01/2081-082 || Construction of Dawali Jal Jhatada Kimwadi Chunabhattee Ghupta Khanepani
IFB NO ; 05/PM/NCB/WORKS/081/82 || Fohor maila kendra jane pahuch marga nirman
IFB NO ; FRM/W/NCB/KWS/2081/082/04 || procurement and laying of pipe
IFB NO : PUDBC/DOTI-007 || Upgrading of Road from maure zero point to Triveni 1-2-3-4-chhatara at Triveni,Bajura
IFB NO : PUDBC/DOTI-006 ||| Construction of Rupali Aadharbhut Ma.vi School building Construction, Swamikartik -Khapar Rural Municipality -01 Rudhi Bajura
IFB NO : PUDBC/DOTI-04 || Construction Of Laligurans Multipurpose Community Building, Chabispathibhera Gaupalika-3,4,5, Bajhang
IFB NO : KRMC/MOR/W/NCB-03(081/82) || Construction of Road Edging and Paving Work.
IFB NO : 081/082-01 || Premise Development work at DAO, Parsa
IFB NO : 081/082-01 || Premise Development work at DAO, Parsa
IFB NO : BMP/NCB/W/02/2081/082 || Kalikastan hudai Ramche Gairigau Road upgrading Work Ba.Na.Pa 9 Road Releted All Civil Works.
IFB NO ; PUDBC/DOTI-03 || Construction Of Narayan Ma.Vi. Building, Jayprithivi Municipality-01, Pimi, Bajhang
IFB NO : 20/081-82/BSMC/WORKS/NCB || Construction of Drain & Culvert Leading to the Jawai Khel Maidan, Butwal-13, Rupandehi
IFB NO : PUDBC/DOTI-02 || Construction & Upgradation of Road Patal-Dhaulkada-Liunde Mela, Bungal Municipality-11,9,8,10
IFB NO : PUDBC/DOTI-01 || Construction Of Road Kauchyakhali-Kedar Mandir Gargau, Dasrathchand Municipality-4, Baitadi
IFB NO : FPS/NCB/GOODS/2081-082/07 || The Procurement of Supply and Delivery of Electronics Goods.
IFB NO : 06/kkni/Road/2081-82 || Upgrading Of MahalaxmiSthan Sirangaun-Jalkini Okharpauwa road plumb ,rcc works
IFB NO: 2/MRMM/WORKS/NCB/081/82 || Mawa Naitepani Malami Tahara Sadak Kalopatre in ward 7
IFB NO : 1/JRM/NCB/GOODS/2081/082 || Supply and Delivery of Hume Pipes
IFB NO ; 4/JRM/NCB/WORKS/2081/082 || Construction of School Building at Shree Rastriya Secondary School ,Joshipur -1 Lakkadmandi Kailali
IFB NO ; PRM/NCB/W/P/PAR/03/2081-82 || Padamarga Nirman
IFB NO : PRM/NCB/W/P/PAR/03/2081-82 || Padamarga Nirman
IFB NO : RRM/MYAGDI/NCB/W/B/01/081/82 || Ward No.2 Muktidham ma.bi Krishi Prabidhik Tarfa ko bhawan ra chhhatrabas Bhawan Nirman
IFB NO ; DWSMB/NCB/03/GOODS2081/2082 || Supply & delivery pf submersible pump set
IFB NO : DUDBC/FPIU/Rupandehi/Works/NCB/39/081/82 || road construction work
IFB NO ; DUDBC/FPIU/Rupandehi/Works/NCB/35/081/82 || Upgradation of road
IFB NO : DUDBC/FPIU/Rupandehi/Works/NCB/34/081/82 || Road construction works
IFB NO : DUDBC/FPIU/Rupandehi/Works/NCB/28/081/82 || Construction of Library Building
IFB NO : UDBC/FPIU/Rupandehi/Works/NCB/27/081/82 || Construction of Lab Building and Park
IFB NO : DUDBC/FPIU/Rupandehi/Works/NCB/26/081/82 || Construction of School Building
IFB NO ; MRM/W/NCB/CDMRW/081/82-01 || Construction of Dovan Maiwakhola RCC Wall
IFB NO ; DUDBC/FPIU/Rupandehi/Works/NCB/25/081/82 || Construction of School Building
IFB NO : wssdo/sunsari/ratuwamai-3/oht/06-081/082 || Construction of 225cum OHT for Ratuwamai-3 Water Supply Project
IFB NO : wssdo/sunsari/treatmentplant/05-081/82C ||
Supply, Delivery and Installation of Water Treatment Plant of Karsiya, Sanishchare & Singhiya Water Supply Project
IFB NO : ARU/NCB/W/04/2081-82 || Retaining structure, side drain, RCC pavement, graveling works, culvert ect.
IFB NO : ARU/NCB/W/03/2081-82 || Retaining structure, side drain, RCC pavement, graveling works, culvert ect.
IFB NO : PMW/NCB/ROAD/NBT/01/081/082 || Narade bhanjyang tiger chowk dewal sarki danda riththe motor baato staronnati (Tiger chowk dewal section) chainage 4+000 to 4+570 wada no. 2
IFB NO : PMW/NCB/ROAD/NBT/01/081/082 || Narade bhanjyang tiger chowk dewal sarki danda riththe motor baato staronnati (Tiger chowk dewal section) chainage 4+000 to 4+570 wada no. 2
IFB NO : OMRM-GUL-W-NCB-31-2081/082 || Rcc Works,Reinforcement Work,Wood Work,Aluminium Works etc.
IFB NO : Godawarimun/lalitpur/W/NCB/11/081/082 || Construction and beautification of Bhansar Pokhari located at Godawari Municipality-11 Chapagaun Lalitpur
© Copyright Thekkabazar. All Rights Reserved