Medical Insurance at Kathmandu
IFB NO : 10/BRM/NCB/2081/ 2082 || Supply and Delivery of Mortury Van (Sab Bahan) at Bardagoriya Rural Municipality Kailali
ढुङ्गा, गिट्टी, बालुवा उत्खनन एवंम् संकलन गर्ने कार्यको बोलपत्र आव्हान सम्बन्धी सूचना
|Four Wheel drive, Operating weight 8000kg +-10%, loader Multipurpose (6 in 1to facilitate dozing, digging, grading, backfilling, grabbing, and loasing) bucket not less than 1 cum, water cooled diesel engine power not less than 90 HP maximum Torque not less than 390 N-M. (Backhoe hydraulic system pressure not less than 220 bar, maximum pump flow not less than 115 LPM. Loader) axle 4wd with fixed rear axle and oscillating front axles. (For more details of specification contact to office or visit website)
IFB NO : Rmun/NCB/Works/10/2081/82 ||Jhurkiya Krishi Bajar Parking Nirman 1. Tatha Interlock Block Halne Kaam
IFB NO : RDDML/337310113/081/82-65 || Roadway upgrading works on Dhorbarahi Sadak Dulegauda-Sankhe Sadak, Suklagandaki (Chainage 0+000 to 10+900), Tanahun 2,411,388.73
IFB NO : RDDML/337310113/081/82-66 || Roadway upgrading works on Kalika Sahid Marga Nagarpalika-7, Satrasaya dekhi ward no.8 and Sahid Gaun Pulimaryang Lauribisauni Road (Chainage 0+000 to 15+000), Tanahun 13,506,027.39
IFB NO : RDDML/337310113/081/82-67 || Roadway upgrading works on Kalika Sahid Shantipark Kalika Mandir Pahuch Marga Chainage 0+400 to 0+800 (2,897,541.65)
IFB NO : RDDML/337310113/081/82-68 || Roadway upgrading works on Pirantebesi- Padini School Road, Lamjung 13,519,112.52
IFB NO : RDDML/337310113/081/82-69 || Roadway upgrading works on Bhoteodar- Belghari- Bharate Gaunda Road, Lamjung 3,858,658.03
IFB NO : WORKS/2081- 82/03 || parkhaal nirmankoMadhesh Institute of Health Sciences, Janakpurdham, Dhanusha.
IFB NO : (LMC/UGC/W NCB/01/2081/082) || Construction of Academic and Administrative Campus Building
IFB NO : MARMA/NCB/WORKS/ 02/2081-082 || Constructionof Matela -Lambagad Road
IFB NO : WIEDO/DLK/W/ NCB-04/2081-082 || Construction of Canal Lining & Stone Masonay work of Bhabra Kharigaira Dabada Irrigation Project Mahabu-1, Dailekh.
IFB NO : WIEDO/DLK/W/ NCB-05/2081-082 || Construction of RCC & Stone Masonary wall of Kuiya Tal Project Dungeshwor-2, Dailekh. Construction of Intake, Pipelines, Water
IFB NO : WIEDO/DLK/W/ NCB-06/2081-082 || Pond, Gabion & Stone Masonay of Banjpani, Naumule Koshedi Irrigation Project Thatikandha-1, Dailekh.
Construction of Canal Linning and Stone
IFB NO : WIEDO/DLK/W/NCB-07/2081-082 Masonay of Kulimuda Dekhi Taplung Mahadev Kunta Irrigation Project Bhagawatimai-7, Dailekh.
IFB NO : UDBO/ILAM/NCB/WORK/34/081/082 || Beautification and Building construction work in Narayansthan Religious Tourism Area at Ilam Municipality 6
IFB NO : UDBO/ILAM/NCB/WORK/35/081/082 || Kirant Yakthum Chumlung Cultural Building construction work at Suryoday 1 Ilam
IFB NO : UDBO/ILAM/NCB/WORK/36/081/082 || Taxi and Jeep Stand construction work at Deumai 1 Ilam
IFB NO : UDBO/ILAM/NCB/WORK/37/081/082 || Building construction work for Religious Tourism at Suryodaya Municiaplity Borbote
IFB NO : UDBO/ILAM/NCB/WORK/32/081/082 || Upgrading of raod from Mechi Highway Dipak Ita Bhatta to Usha Chowk Marga
IFB NO : UDBO/ILAM/NCB/WORK/38/081/082 || Gauradaha udyog Banijya sangh community hall gauradha-3 jhapa
IFB NO : UDBO/ILAM/NCB/WORK/39/081/082 || Construction of Bramha kumari community and jesta nagarik pratisthan building damak-5
IFB NO : UDBO/ILAM/SQ/WORK/33/081/082 || Upgrading of sarpat marga damak -09 jhapa
Upgrading of Namuna tole bikas sastha Sukambasi Basti Damak-4
IFB NO : UDBO/ILAM/NCB/WORK/34/081/082 || Construction of Alekh Mahima and patanjali yoga Centre Damak -4
IFB NO : UDBO/ILAM/SQ/WORK/35/081/082 || Upgrading of Road From Jagarnath holi to chachu tukre, Kamal R.M.-05 Jhapa
IFB NO : UDBO/ILAM/SQ/WORK/36/081/082 || Upgrading of Road from Phuluwa jhagar house to Nahar Chok kamal-1
IFB NO : UDBO/ILAM/SQ/WORK/37/081/082 || Upgrading of road at Sabitra chowk Sukumbasi Basti kamal -5 Jhapa
IFB NO : UDBO/ILAM/SQ/WORK/38/081/082 || Upgradation of the road leading from Bokttobari Vinod Rajvanshi's house to Phulsingh Rajvanshi's house
(Bhadrapur-07 jhapa)
IFB NO : UDBO/ILAM/SQ/WORK/39/081/082 || Upgradation of road from Bal Krishna Aryal's house to West Baghdunga Paini, Bhadrapur Municipality Ward.7
IFB NO : UDBO/ILAM/SQ/WORK/40/081/082 || Upgrading of Road Chandni Chowk Satsang Nepal Mahanand Chowk along Dhulabari Sec School Road to NMB Bank Me.N.P-10 Jhapa
IFB NO : BM/NCB/W/081-82/01 || Construction of 10 bed Hospital
IFB NO : BM/NCB/W/081-82/02 || Construction of DurgaTemple
IFB NO : SDO/ MUG/W/NCB/03/081-082 || Two Story Four Room Building Construction for Shree Bijaya Basic Residental School, Soru Rural Municipility-07, Lidichaur Sipa, Mugu 5907477.82
IFB NO : 06/NCB/DRT/Works/WIE DO-Kalikot/2081-082 || Construction of Gabion Revetment in Dori khola, Palata-3, Kalikot 48,27,703.44
IFB NO : 07/NCB/TRT/Works/WIE DO-Kalikot/2081-082 || Construction of Check dam and Gabion Revetment wall in Tushar khola, Sannitriveni-7, Kalikot 48,27,240.73
IFB NO : 08/NCB/RTP/Works/WIE DO-Kalikot/2081-082 || Construction of Plain sedimentation Tank, Slow sand filter, RVT and other TP related structure for Raskot Brihat WSTP, Raskot Na.Pa, Kalikot
IFB NO : BRM / RCW/NCB/04/2081/082 || Construction work at Dailekh
IFB NO : Lidpo/Lumbini/NCB/ W/R/081 82/81 || Upgrading of Dhwadi Bhirkhani Khalidanda Road, Chandrakot-02, Gulmi 10,467,003.24
IFB NO : Lidpo/Lumbini/NCB/ W/R/081 82/82 || Upgrading of Kisantaari-Dagaas-Arkhabang Road, Malika RM, Gulmi 14,487,629.75
IFB NO : Lidpo/Lumbini/NCB/ W/R/081 82/83 || Upgrading of Jaukhet-GhodKhase- Arlangkot-Deurali-Saalimedah-Aapchaur Road, Musikot Municipality-09, Gulmi 9,660,327.02
IFB NO : Lidpo/Lumbini/NCB/ W/R/081 82/84 || Upgrading of Hurdungkot-Purangaun -Shilathape-Dandakateri-Salimedah Road,
Musikot Municipality-08, Gulmi 9,659,867.16
IFB NO : Lidpo/Lumbini/NCB/ W/R/081 82/85 || Upgrading of Paudi Amarai Dhad Rangnaam Kotkateri Road, Musikot Municipality, Gulmi 9,660,481.75
IFB NO : Lidpo/Lumbini/NCB/ W/R/081 82/86 || Upgrading of Bhanjyang Bhirkhaani Walibang Ghaampaali Road, Chandrakot RM-02, Gulmi 12,364,239.18
IFB NO : Lidpo/Lumbini/NCB/ W/R/081 82/87 || Upgrading of Dhobighat Rimuwa Road, Ruru Kshetra RM, Gulmi 10,468,307.32
IFB NO : Lidpo/Lumbini/NCB/ W/R/081 82/88 || Upgrading of Lamapata Bagaune Road, Ruru Kshetra-05, Gulmi 9,660,286.34
IFB NO : Lidpo/Lumbini/NCB/ W/R/081 82/89 || Upgrading of 1) Rimuwachhap-Rudrabeni Road, Ruru RM, Gulmi, 2) Ratamata-Coffee Anusandhan-Jhamadi-Aampokhara Road, Ruru RM, Gulmi, 3) Lamsarang-Satyawati Paryatak and Krishi Road, Satyawati RM,
Gulmi 11,591,834.61
IFB NO : Lidpo/Lumbini/NCB/ W/R/081 82/90 || Upgrading of Parsiya Chowk-Parsiya Village-Gandak Nahar Road and Drain Construction, Palhinandan RM, Bardaghat Nawalparasi (West) 9,658,692.93
M/S Swyambhu Nirman Sewa, Dhumbarahi, Kathmandu 18,08,555.34
M/S Purbeli Infrastructure and Engineering Pvt.Ltd, Kapan, Kathmandu 13,83,926.45
M/S Swyambhu Nirman Sewa, Dhumbarahi, Kathmandu 17,97,160.80
M/S Purbeli Infrastructure and Engineering Pvt.Ltd, Kapan, Kathmandu 14,57,410.68
M/S N.K. Construction, Ratuwamai, Morang 35,51,447.29
M/S Hiwa Nirman Sewa, Patharisanischare, Morang 27,81,492.50
M/S Purbeli Infrastructure and Engineering Pvt.Ltd, Kapan, Kathmandu 26,17,906.15
M/S Salma Construction, Sunwarshi, Morang 14,02,635.31
M/S Salma Construction, Sunwarshi, Morang 13,95,554.40
M/S Salma Construction, Sunwarshi, Morang 13,96,927.35
M/S Salma Construction, Sunwarshi, Morang 14,49,129.96
M/S Lalita Construction, Sunwarshi, Morang 67,46,754.73
M/S Ma Bisahara Construction Pvt.Ltd, Inaruwa, Sunsari 23,91,163.00
M/S Avion Construction, Dhangadhimaii, Siraha 33,45,019.10
M/S Maa kankalini Construction Pvt.Ltd, Hanumannagar, Saptari 34,29,632.69
M/S Sunbarshi Nirman Tatha Dhuwani Sewa, Sunbarshi, Morang 40,28,883.83
M/S Maa kankalini Construction Pvt.Ltd, Hanumannagar, Saptari 13,44,935.80
M/S Bhimashankar Construction, Gadhi, Sunsari 30,70,064.52
IFB NO : 02/SRM/NCB/ SSA/081-082 || Sammarimai Ga.Pa. ward no 3 thumahawa Gau Dekhi Dakshin Thikahawa Jane Bato tatha Thumahawa dekhi purba panditpur Bangawa Piprahiya Nagwaliya Nahar ko pul dekhi purba Gaidahawa nala hudai ilaka prahari Karyale marchawar jane Sadak Estarunnati kalopatre garne kam
IFB NO : 03/SRM/NCB/ SSA/081-082 || Hardi Betkuiya Medrahawa Nawabidih ra Bhawandihawama Sadak PCC Dhalan
IFB NO : 04/SRM/NCB/ SSA/081-082 || Construction of Betkuiya Healthpost Building at ward no: 07
IFB NO : NRSS/NCB/081/082-01 || Constructons of ECD Building with Toilet
IFB NO : DMO/JHAPA/ BUILDING/30/081-82 || Construction of Satya Sahi Community Building, Damak 6 (2514129.41)
IFB No ; WRIDDO/BKIP/WORK/NCB-01/081-82 || Construction of Canal and Canal Structures of Bagaha Khola ISP, Devchuli-16, Bahrakol, Nawalparasi (Ba.Su.Pu.)
IFB No ; WRIDDO/BKIP/WORK/NCB-02/081-82 || Construction of Canal and Canal Structures of Nagartandi IP, Gaindakot-14, Nawalparasi (Ba.Su.Pu.)
IFB No ; WRIDDO/BKIP/WORK/NCB-03/081-82 || Construction of Canal and Canal Stuctures of Kakarsoh Khola Samagra IP, Gaidakot-12, 13, Nawalparasi (Ba.Su.Pu.)
IFB No ; WRIDDO/BKIP/WORK/NCB-04/081-82 || Construction of Canal and Canal Structures of Devsoth Khola Sinchai Kulo Nirman, Devchuli Na.Pa. 10,11,12,14,15, Nawalparasi (Ba.Su.Pu.)
IFB No ; WRIDDO/BKIP/WORK/NCB-05/081-82 || Construction of Canal and Canal Structures of Amrasa IP, Madhyabindu-7, Nawalparasi (Ba.Su.Pu.)
IFB No ; WRIDDO/BKIP/WORK/NCB-06/081-82 || Construction of Canal and Canal Structures of Kusundetar IP, Madhyabindu-11, Nawalparasi (Ba.Su.Pu.)
IFB NO : KRM-NCB-WORKS -02-081-082 || Construction of Health Post Building in Ward No. 6 of Khandadevi Rural Municipality. १,९९,२०,९८५७६
IFB NO : BMP/SQB/GOODS/2081-82/1/5 || Supply and Delivery of Educational AVR system, Printer and Multi-biometric attendance device
८,०३,२८४|१८
IFB NO : IFB05/RDCJI/33701177/NCB /081/82-21 || Roadway Rehabilitation and Rigid Pavement Works along Rapti Highway (Khaulapass- Musikot Section), Rukum West
IFB NO ; Mahalaxmi/W/ /NCB/05/2081/82 || Upgrading Works of Town Planning Main road Bata Uttar Tarfa Samma ko Sadak
IFB NO ; Mahalaxmi/W/ /NCB/06/2081/82 || Upgrading works of Mahalaxmi Campus-Chetana School jane Sadak
IFB NO ; Mahalaxmi/W/ /NCB/07/2081/82 || Upgrading& Blacktop works of Maagachal- Uttar Tarfa Changathali jane Sadak
IFB NO ; Mahalaxmi/W/ /NCB/08/2081/82 || Upgrading Works of Town Planning Main road Bata UttarTarfa Jodne Sadak
IFB NO : MRM/Myagdi/NCB/W/R/05/081/082 || Construction & Upgrading of Babiyachaur-Kafalchaur-Salyan- Bharjula-Hidi Motarbato 9999933.06/-
IFB NO : 09/JRM/2081/82 || Construction of Killauda Ubigad Lift Irrigation Project at Jorayal Rural Municipality Ward No.01, Doti
IFB NO : RAGHUNATH/WORK/ NCB/1/2081/082 || Completion of RCC Framed School Building ५९,९१,886|७०
IFB NO : Nagarjun/NCB/G/02/2081-82 || Supply and Installation of Desktop Computers, Laptop and 3 in 1 Printers.
Construction work at Kaski
© Copyright Thekkabazar. All Rights Reserved