IFB No : NWSC-JLR-06-2080/081 Construction of Boundary Wall
IFB No : 94-BMC/80/81/G/NCB/128 || Installation for CCTV System With VMS Works
IFB No : IMEP/ Dhankuta /B-1A/CW-19 || Construction/ rehabilitations of Rindovane Ketabari Irrigation Sub Project
IFB No : IMEP/ Dhankuta /B-1A/CW-18 || Construction/ rehabilitations of Birendra kulo Irrigation Sub Project
IFB No : BH/NCB/WORKS/49/ 2080/081 || Construction of OPD Void NUrssing Faculty Room &Lab
IFB No : IMEP/ Sakhuwasabha /B-1A/CW-20 || Construction/ rehabilitations of Kenwa Khola Fitywa Malibheg Irrigation Sub Project
IFB No : IMEP/ Sakhuwasabha /B-1A/CW-21 || Construction/ rehabilitations of Pangma Khola Badareni Irrigation Sub Project
IFB No : IMEP/ SindhuPlanchok/B-1A/CW-51 || rehabilitations of Mahadev Khola Sineghari Dittiya I Irrigation Sub Project
IFB No : IMEP/ SindhuPlanchok/B-1A/CW-52 || rehabilitations of Mahadev Khola Sineghari Dittiya I Irrigation Sub Project
IFB No : NEA-LPDON-HR-2080/081-10 || Supply of Human Resources
IFB No : CW-38/080/081-01 || Construction of Headworks and Canal related structure of Gagan Irrigation Sub Project, Sukhipur, Siraha
IFB No : L-95/2080/081 || neurosurgery electric drill
IFB No : CW-018 || Rehabilitation of Birendra Kulo Irrigation Sub Project that includes reshaping of the existing canal, construction of structures like side intake, cross drainage works, village road bridges, simple fall structures, HDPE Pipe and RCC canal lining.
IFB No : CW-019 || Rehabilitation of Tindovane Kerabari Irrigation Sub Project that includes reshaping of the existing canal, construction of structures like side intake, cross drainage works, village road bridges, simple fall structures, HDPE Canal and RCC canal lining.
IFB No : NRB/GOODS/NCB/03/080/81 || Supply Delivery and Installation of Air Conditioner 26 Set
IFB No : Re-KGB-2080/081-SQ-01 || Partition Works AT office khimti Grid Branch
IFB No : NEA/JLDC/2080-082-NCB -05 || Construction of HT/LT Line and Transformer Installation Works
IFB No : NEA/JLDC/2080-082-NCB -06 || Construction of HT/LT Line and Transformer Installation Works Different Place of Jaleshwor
IFB No : l-95 || Neurosurgery Electric Drill
IFB No : NDCL/CTO/ICB/09/080-81 || M/s LOLC Technologies Ltd. sin Lanka
IFB No : NDCL/CTO/ICB/09/080-81 || M/s 4i Apps Solutions Private Limited Indian
IFB No : NDCL/CTO/ICB/09/080-81 || M/s Rostan-Dristi JV Nepal
IFB No : NEA-LPDON-HR-2080/081-10 || जनशक्ति आपूर्ति सम्बन्धि
IFB No : 28/RM/NCB/W/2080/081 || Ammar Shahid Dashrath Chand Ma. Vi. School Building Construction works
IFB No : RA/11/2081/082 || Internal Revenue from River Bed Material at West side area of Sitalpur Bridge at ward no 12,13
IFB No : NA/WDHQ/NCB/Building/081/82/01 || Remaining work of Col. Building G+2 Completion
IFB No : RA/10/2081/082 Internal revenue from River Bed Material at East area of Sitalpur Bridge ward no 12
IFB No : RA/09/2081/082 || Internal Revenue from River Bed Material at Gothuwa Ganar, Babai Nadi- Gwar khola Dovan at ward no 14
IFB No : RA/08/2081/082 || Internal Revenue from River Bed Material at vojpur Ghat area ward no 14
IFB No : RA/07/2081/082 || Internal Revenue from River Bed Material at North Area of Bhamke Khola - Patu khola Dovan ward no 8
IFB No : RA/06/2081/082 || Internal Revenue of River Bed Material from north side of Bhamke bridge Batalpur area ward no 8 and South side of Bhamke bridge Batalpur area ward no 8
IFB No : RA/05/2081/082 || Internal Revenue of River Bed Material from Patre khola- Hapur Khola Dovan at ward no 17 and South side of Kothari Bridge of Hapur khola ward no 15 and Hapur khola Babai Nadi Dovan area ward no 15
IFB No : NA/EDTTS/WORKS/081/82/01 || Construction of Ladies Line
IFB No : 080/81--03 || Remaining Work for Upgradation of Gaighat Diktel Road between Simpani (Ch. 78+900) & Mahure (100+900) upto Double Lane DBST Standards to, Khotang
IFB No : NA/3BDE/NCB/WORKS/081/82/01 || Construction of 20 bed Ladies Jawan Line (G+1) at No 3 BRIGADE Khairenitar,Shuklagandaki, Tanahun
IFB No : NA/FHR/NCB/WORKS/081/82/01 || Construction of 1x20 Bed Jawan Line (G+1) in Field Hospital Rupandehi.
IFB : NA/FWD/NCBWORKS/081/82/01 ||
Construction of Colonel Apartment (G+2) |
IFB No : NA/KBB/NCB/WORKS/081/82/01 || Construction of Jawan Line 40 Bed(G+1)
IFB No : 080/81-03 || Remaining Work for Upgradation of Gaighat Diktel Road between Foxingtar. (Ch. 52+500) & Simpani (78+900) upto Double Lane DBST Standard, Khotang.
IFB No : NA-19BDE-NCB-WORKS-081/82-01 || CONSTRUCTION OF 40 BED JAWAN LINE (G)
IFB No : MLMAC/NCB/2080-81-G1 || Supply, Delivery, Testing, Commissioning, Installation and Operation of Liquid Nitrogen Plant and Accessories
IFB No : NA/RANASINGHDAL/NCB/WORKS/081/82/0 || New Construction of 1*20 Bed Ladies Jawan Line (G+1)
IFB No : NA/DG/NCB/WORKS/081/82/01 || Construction of Company Commander's Bunglo Plinth Ht. 2ft
IFB No : NA/MID-DIV/2081/82/ || construction of ladies line G+1 (1*20 beds)
IFB No : NA/22BDE/NCB/WORKS/081/82/01 || Construction of 20 bed Ladies Line(G+1) at Ramnagar Barrack,Butwal
IFB No : DMO/JHAPA/Building/58/080-081 || Construction of Saraswati Secondary school Building, Damak 9 Phase
IFB No : NA/KBBN/081/82/01 || Construction Of Work
© Copyright Thekkabazar. All Rights Reserved