Works:
IFB NO : DRM/BTD/WORKS/NCB/05/2081/082 || Construction and Upgrading Of Dadiya-Setigaun-Saungaun-Nagaraun and Negaun-Dhamigaun Road
Works:
IFB NO : 03/81-82/CWSP-Prajapati/FWSSMP_BRT || Construction of Overhead RCC Cylindrical Water Tank of 100m3 Capacity for Prajapati Water Supply Project, Kanakai Municipality-1 Jhapa
Works:
IFB NO : NCB-11/2081-082 || Construction of pump house overhead tank with pipe fitting at devi tole irrigation project sainamaina 7 and construction of RCC drainage works at bansgadhi khola niyantran, sainamaina 9, rupandehi
Works:
IFB NO : NCB-11/2081-082 || Construction of pump house overhead tank with pipe fitting at devi tole irrigation project sainamaina 7 and construction of RCC drainage works at bansgadhi khola niyantran, sainamaina 9, rupandehi
Works:
IFB NO : JSMC/NCB/WORKS/29-2081/82 || Construction of Bakuliya Khanepani Project
Works:
IFB NO :08/GRM/WORKS/NCB/2081/082 || Construction Of Suryapura Ghat
Works:
IFB NO : Lidpo/Lumbini/NCB/W/R/081_82/137 || Upgrading of Suli chaur-Tebang-Rajya Pokhari Lisne - Pyuthan Road, Sunilsmriti RM-07,Rolpa
Works:
IFB NO : NCB/14/081-82 || Construction of Sisaudanda-Raneura-Leduwa-Kusma Black Topped Asphalt Road and Drain Construction
Works:
IFB NO : Lidpo/Lumbini/NCB/W/R/081_82/136 || Upgrading of Sulichaur-Gam Road, Sunchhahari RM, Rolpa
Works:
IFB NO : 08/GRM/WORKS/NCB/2081/082 || Construction Of Suryapura Ghat
Works:
IFB NO : Lidpo/Lumbini/NCB/W/R/081_82/137 || Upgrading of Suli chaur-Tebang-Rajya Pokhari Lisne - Pyuthan Road, Sunilsmriti RM-07,Rolpa
Works:
IFB NO : Lidpo/Lumbini/NCB/W/R/081_82/136 || Upgrading of Sulichaur-Gam Road, Sunchhahari RM, Rolpa
Works:
IFB NO : Lidpo/Lumbini/NCB/W/R/081_82/136 || Upgrading of Sulichaur-Gam Road, Sunchhahari RM, Rolpa
Works:
IFB NOI : JSMC/NCB/WORKS/28-2081/82 || Construction of Flexible Pavement in Lamidadha JSMC 18
Works:
IFB NO : JSMC/NCB/WORKS/27-2081/82 || Construction Of Conrete Road And Rcc Drain, JSMC 15
Works:
IFB NO : JSMC/NCB/WORKS/26-2081/82 || Construction Of Drain and Road at School Chock And Nahar Tole, JSMC 24
Works:
IFB NOI : JSMC/NCB/WORKS/25-2081/82 || River Training Works(Gabion Work) At Bakuliya, JSMC 5
Works:
IFB NO : 05/MM/MKSSN/NCB/WORKS/081/82 || Myanglung Keurini Simara Sadak Nirman
Works:
IFB NO : 05/MM/MKSSN/NCB/WORKS/081/82 || Myanglung Keurini Simara Sadak Nirman
Works:
IFB N O : JSMC/NCB/WORKS/24-2081/82 || Construction Of flexible Pavement Road From Adarsh Chowk JSMC 16
Works:
IFB NO : JSMC/NCB/WORKS/23-2081/82 || Construction Of drain From Tinkune Chock, JSMC 17
Works:
IUFB NO ;' JSMC/NCB/WORKS/23-2081/82 || Construction Of drain From Tinkune Chock, JSMC 17
Works:
IUFB NO ;' JSMC/NCB/WORKS/23-2081/82 || Construction Of drain From Tinkune Chock, JSMC 17
Works:
IUFB NO ;' JSMC/NCB/WORKS/23-2081/82 || Construction Of drain From Tinkune Chock, JSMC 17
Works:
IFB NO : JSMC/NCB/WORKS/22-2081/82 || Construction Of Flexible Pavement At Basidilwa Tole JSMC 20
Works:
IFB NO : TTDO/NCB/01/W/2081/082 || Doghare Town Planning Purba Tarfa Ko Line ra Pashim Tarfa Baki Sadak Estarunnati , ward no 9
Works:
IFB NO : 06/MM/WKBN/NCB/WORKS/081/82 || Wadaa Karyalaya Bhawan Nirman
Works:
IFB NO : 11-RDDOT/2081/082-034 || Post Monsoon works along Syaule-Silgadhi Section of Seti Highway, Doti
Works:
IFB NO : 11-RDDOT/2081/082-034 || Post Monsoon works along Syaule-Silgadhi Section of Seti Highway, Doti
Works:
IFB NO : 11-RDDOT/2081/082-033 || Post Monsoon Works along Mahakali Highway (Faltude - Anarkholi section) Chainage 67+400 to 152+400.
Works:
IFB NO : 02-081/82-CTEVT/RAPTI-NSC/WORKS || Construction of Cafeteria and Multipurpose Hall Building under National Competitive Bidding Procedures. CTEVT, Rapti Technical School, Dang
Works:
IFB NO : PUDBC/CHITWAN/NCB/WORKS/51/081/082 || Upgradation of road at from Dobanchaur, Hetauda-18, to Danda Gaun Makwanpur.
Works:
IFB NO : IDO/PAR/NCB/W/02/2081/82 || construction of two box bridge/ culvert at two different location and rigid pavement works.
Works:
IFB NO : PUDBC/CHITWAN/NCB/WORKS/50/081/082 || Upgradation of Ring road at Hetauda-16, Makawanpur under program of ring road upgradation Hetauda-15,16,17
Works:
IFB NO : TM/NCB/W/02/2081-82 || CONSTRUCTION WORKS RCC WORKS
Works:
IFB NO : PUDBC/CHITWAN/NCB/WORKS/49/081/082 || Upgradation of Ring road at Hetauda-(15,17), Makawanpur under upgradation of ring road at Hetauda 15,16,17 program
Works:
IFB NO : PBIMO-PIS-09-2081/82 || Construction of Canal and Canal structures at Kolahi and Panch Gaule Kulo Bankatta of Praganna Irrigation System
Works:
IFB NO : AMO/NCB/W-02/2081/082 ::Construction of Ward office Gate,Compound Wall,septic tank, Retaining Structura at Aathbiskot-07,13.
Works:
IFB NO : 08/GRM/WORKS/NCB/2081/082 || Construction Of Suryapura Ghat
Works:
IFB NO : NCB/14/081-82 || Construction of Sisaudanda-Raneura-Leduwa-Kusma Black Topped Asphalt Road and Drain Construction
Works:
IFB NO : Lidpo/Lumbini/NCB/W/R/081_82/136 || Upgrading of Sulichaur-Gam Road, Sunchhahari RM, Rolpa
Works:
IFB NO : JSMC/NCB/WORKS/28-2081/82 || Construction of Flexible Pavement in Lamidadha JSMC 18
Works:
IFB NO : JSMC/NCB/WORKS/27-2081/82 || Construction Of Conrete Road And Rcc Drain, JSMC 15
Works:
IFB NOI : JSMC/NCB/WORKS/26-2081/82 || Construction Of Drain and Road at School Chock And Nahar Tole, JSMC 24
Works:
IFB NO : JSMC/NCB/WORKS/25-2081/82 || River Training Works(Gabion Work) At Bakuliya, JSMC 5
Works:
IFB NO : BRM/081/82/WORKS/19 || Kamidanda Yudha Smriti Park
Works:
IFB NO : JSMC/NCB/WORKS/24-2081/82 || Construction Of flexible Pavement Road From Adarsh Chowk JSMC 16
Works:
IFB NO :. JSMC/NCB/WORKS/23-2081/82 || Construction Of drain From Tinkune Chock, JSMC 17
Works:
IFB NO : BRM/081/82/WORKS/18 || Karma Dechen Palber Ling Gumba Construction
Works:
IFB NO : BRM/081/82/WORKS/17 || Chyasingkharka Health Post Building Construction
© Copyright Thekkabazar. All Rights Reserved