Works:
IFB NO : JSMC/NCB/WORKS/22-2081/82 || Construction Of Flexible Pavement At Basidilwa Tole JSMC 20
Works:
IFB NO : STIDH/GOODS/NCB/07-081/082 ||| Supply and Delivery of Rasan Goods
Works:
IFB NO : 11-RDDOT/2081/082-033 || Post Monsoon Works along Mahakali Highway (Faltude - Anarkholi section) Chainage 67+400 to 152+400.
Works:
IFB NO : 02-081/82-CTEVT/RAPTI-NSC/WORKS || Construction of Cafeteria and Multipurpose Hall Building under National Competitive Bidding Procedures. CTEVT, Rapti Technical School, Dang
Works:
IFB NO : PUDBC/CHITWAN/NCB/WORKS/51/081/082 || Upgradation of road at from Dobanchaur, Hetauda-18, to Danda Gaun Makwanpur.
Works:
IFB NO : GNH/NCB/2081/82/03 || Open Bidding of Medicine and Surgical Materials
Works:
IFB NO : TM/NCB/W/02/2081-82 || CONSTRUCTION WORKS RCC WORKS
Works:
IFB NO : PBIMO-PIS-09-2081/82 || Construction of Canal and Canal structures at Kolahi and Panch Gaule Kulo Bankatta of Praganna Irrigation System.
Works:
IFB NO : AMO/NCB/W-02/2081/082 || Construction of Ward office Gate,Compound Wall,septic tank, Retaining Structura at Aathbiskot-07,13.
Works:
IFB NO : DM/BLD/NCB-24/081/82 || Baraha Mandir Nirman Devdaha Municipality
Works:
IFB NO : GM/works/NCB/2081/82-2 || Construction of Puranobuspark Kholkhole Sadak nala Tatha Footpath
Works:
IFB NO : SNHC/NCB/ST-01/081/82 || Air tickets for 1200 haj pilgrims of 2025.
Works:
IFB NO : SNHC/NCB/ST-01/081/82 || Air tickets for 1200 haj pilgrims of 2025.
Works:
IFB NO : NTrC/G/NCB/16-081/82 || The Procurement of Supply, Delivery and Installation of Spine Endoscope
Works:
IFB NO : KM-03-NCB/081/082 || Wada no 9 dumari ma khane pani tanki nirman karya.
Works:
IFB N O : RAT/CHITWAN/works/NCB/24/2081-82 || Providing and laying Bituminous concrete/Asphalt concrete, RCC rigid pavement, and canal lining at ward no 13 and 16.
Works:
IFB NO : PBIMO-PIS-04-2081/82 || Construction of Canal and Canal Structures at Pipari Bhanpur and Dulari of Praganna Irrigation System.
Works:
IFB NO : CEHRD/NCB/EV/2081/82/04 || The Procurement of Electric Car (SUV)
Works:
IFB NO : PBIMO-PIS-03-2081/82 || Construction of Canal and Canal Structures at Lathawa and Paharawa of Praganna Irrigation System.
Works:
IFB NO : GM/works/NCB/2081/82-1 || Upgrading of Grahapani -Putalibagaecha Jyadul Road
Works:
IFB NO : PUDBC/CHITWAN/NCB/WORKS/48/081/082 || Construction of Administration Building of Bhuwani Shanker College, Khairahani, Chitwan
Works:
IFB N O : PBIMO-PIS-02-2081/82 || Construction of Canal and Canal Structures at Sishaniya and Masuriya of Praganna Irrigation System.
Works:
IFB NO :' 3-GRM-PYU-Works-2081/082 || Construction of Narikot Lift Khanepani Tatha Sanitation Project.
Works:
IFB NO : 3-GRM-PYU-Works-2081/082 || Construction of Arkha Health Post Building.
Works:
IFB NO : Khwopass/NCB/Goods/UNC/081/82 || Supply and Delivery of Uniform Cloths and uniform material as per khwopa secondary school
Works:
IFB NO : NCB/BRM/GOODS/002/2081-82 || Supply delivery and installation of IT Related Goods
Works:
IFB NO : BANKE/TDO/WORKS/NCB-03/2081/082 || Construction of Truss, toilet, etc
Works:
IFB NO : BANKE/TDO/WORKS/NCB-02/2081/082 || Boundary Pillar Construction,etc
Works:
IFB NO : BANKE/TDO/WORK/NCB-01/2081/082 || Construction of Boundary wall, Gate etc
Works:
IFB NO : AMO/NCB/W-01/2081/082 || Construction of Foot trail,Railing,Gate and other infrastructure for Chhimi.
Works:
IFB NO : khwopass/NCB/Goods/tr/2081/82 || Supply and Delivery of Track Suit as Per Khwopa Secondary School Saple
Works:
IFB NO : KRM-07/2081/082 || Simle Khola Boshan Khola Landslide Protection
Works:
IFB NO : 11/NWSCPKR/WORKS/2081-082 || PE pipe line extension work at different places with road reinstatement works.
Works:
IFB NO : BRM/NCB/KHANEPANI/WORKS/DOLAKHA/04/2081/82 || This project includ pipeline works,crossing works, rvt,dc,tapstand etc.
Works:
IFB NO : JSMC/NCB/WORKS/21-2081/82 || Construction Of Drain and Road Near Hajindra Hajara House, JSMC 10
Works:
IFB NO : LAL/W/NCB/081/082-03 || Construction Of Black Top Motarghat Road Laljhadi-04
Works:
IFB NO : BRM/PAR/W/NCB/AH/05/081/82 || Construction of Auditorium Hall,Electrical work,Furniture and beautification Work In Wahaki Namuna Ma.VI.
Works:
IFB NO : 18/KM/NCB/2081-82 || Nagarpalika bhitraka bibhinna sadak marmat (Ward 6 ko bibhinna sthanko bato marmat, hattikhor dekhi army barracks hudai maharajamandir jaane bato marmat ward 1,Chilaha school tol bato marmat ward 4, Pithauli chok dekhi rajmarga jane bato marmat ward 11, Purano rajmarga marmat ward 12, Tribhuwan highschool agadik bato marmat)
Works:
IFB NO : RCIP/PIU-4/IFB-03/2081-82 || Road construction works at Harrapata Sapaude. Major works include Earthwork, Stone Masonry, Gabion, Causeway
Works:
IFB NO : TUTH/NCB/P1/M-018/2081/082 || Dental Chair (M-018)
Works:
IFB NO : PUDBC/DKT/NCB/WORKS/34/081/082 || Construction of Surya Bahadur Thapa Smriti Pratisthan Building in Muga, Ward No.8, Pakhribas Municipality, Dhankuta.
Works:
IFB NO : 06/DRMM/NCB/W/2081/082 || Construction of Saraswati Ma.Vi. Hostel Block
Works:
IFB NO : WRIDDSANKHU/Works/NCB-01/2081-82 || Construction of Canal and its associated structures
Works:
IFB NO : MOPID/KOSHI/NCB/W-01/081/82 || Assembly of Bailey Bridge over Hewa River Along Jorpokhari-Panchamukhi-Machchhebung-Lungmaden-Bhaise-Charhaate Road
Works:
IFB NO : URM/NCB/WORKS/2081-082/5 || Construction of Nayapul-Pairebesi road section
Works:
IFB NO : MOPID/KOSHI/NCB/W-02/081/82 || Assembly of Bailey Bridge over Piluwa River Along Gufapokhari-Chainpur-Barhabise Road, Chainpur-01
Works:
IFB NO : WRIDDSANKHU/Works/NCB-01/2081-82 || Construction of Canal and its associated structures
Works:
IFB NO : TUTH/NCB/P1/M-019/2081/082 || Lab Chemicals (M-019)
Works:
IFB NO : MGO/081/82/10 || Snow Clothing Items
Works:
IFB NO : WRIDDB/SQ/PRT/25/081-82 || Construction of Slope Revetments Works at Paruwa Khola, RaptiSonari-8, Banke
© Copyright Thekkabazar. All Rights Reserved