Works:
IFB NO : IDO/DDL/NCB/W/081/082-06 || Structure Works
Works:
IFB NO : IFB-081/82-4-3 ||| Road Upgrading Works on Aatichaur- Dogadi road, Bajura
Works:
IFB NO : IFB-081/82-4-3 || Road Upgrading Works on Aatichaur- Dogadi road, Bajura
Works:
IFB NO : IDO/DDL/NCB/W/081/082-04 || Structure Works
Works:
IFB NO : IFB-081/82-4-2 || Road Safety works on Sanfe-Martadi Road Section,Achham & Bajura
Works:
IFB NO : IDO/DDL/NCB/W/081/082-09 || Stone masonry,Hume pipe,gabion & RCC works
Works:
IFB NO : BLDG/NCB/MAN-11/081-82 || The Work consist of Building construction including with Civil works, Sanitary works and Electrical works.
Works:
IFB NO ; IFB-081/82-4-1 || Roadway Cutting and Structural Works on Sanfebagar-4 Himalaya ma.vi dekhi Bimkot sadak khanda road, Achham
Works:
IFB NO : BLDG/NCB/MAN-10/081-82 ||| a)Multi storey RCC building b)Land development c) Water Tank d) Septic tank e) Soak pit f) Manhole g) Sanitary Works h) Electrical works. As per design, drawings, BOQ and specifications
Works:
IFB NO : IDO/DDL/NCB/W/081/082-02 || EarthWork
Works:
IFB NO : Pyuthan/Hospital/good/ncb-01/081/082 ||
Works:
IFB NO : NEA-SPHPS-2081/82-ST-EM-2 || Repair and Maintenance of Turbine and its Components of Seti Hydropower Station
Works:
IFB NO : bktmun/NCB/works/03/081/82 || Construction of Cold storage Building (Phase III)
Works:
IFB NO : bktmun/NCB/works/02/081/82 || Taaraa Laan Road Upgrading Work
Works:
IFB NO : 30-BMC/081/082/W/NCB/54 || Blacktopped Road Construction in Three Different Roads of BMC-18
Works:
IFB NO : ITR/NCB/11W/081/082 || Upgradation of road (Interlock block) at Sangam Marga, Itahari-10, Sunsari
Works:
IFB NO : RAINAS/NCB/W/02/081/082 || Building COnstruction
Works:
IFB NO : IDODLK/W/NCB/53/081/082 || Thulo Dhunga Guyali Chautaro Bulung jane Sadak Staronnati, Bigu- 4, Dolakha
Works:
IFB NO : TSMC/NCB/31/W/2081/082 | || Nagarpalika Bhitraka Bivinna sadak Marmat (Dudharas chowk -barleni chowk,Thangau chowk- Bijauri chowk,Bijauri chowk -Basgadhi road,Balapur chowk - Ma.bi balapur,Hatikhauwa chowk - yatayat karayalaya jane bato.,Rakshya chaur guru jajur school -nilkanthyashwor mandir road.,Purano yatayat karyalaya dakshin tira bato,Bazzar area inner road).
Works:
IFB NO : 10-RDDDOT/2081/082-031 || Bridge and Culvert Protection Works along Seti highway and Silgadhi- Chaukhutte Road, Doti.
Works:
IFB NO "; 10-RDDDOT/2081/082-031 || Bridge and Culvert Protection Works along Seti highway and Silgadhi- Chaukhutte Road, Doti.
Works:
IFB NO : 5/RMB/NCB/081-082(AssemblyStageConstruction) || Construction of Assembly Stage, Toilet with Ground Management works and Chain Link Fencing with Retaining Structures around the Ramkot Ma.Bi. School primeses. at Rupa-7,Kaski
Works:
IFB NO : FUDBC/Dang/60/2081/82 || Upgradation of Road from Ward Office- Garuwa-Karmatuwa-Karmatiya-Tharuwar at Ghorahi Sub Metropolitian City 09, Dang
Works:
IFB NO : FUDBC/Dang/60/2081/82 || Upgradation of Road from Ward Office- Garuwa-Karmatuwa-Karmatiya-Tharuwar at Ghorahi Sub Metropolitian City 09, Dang
Works:
IFB NO : FUDBC/Dang/60/2081/82 || Upgradation of Road from Ward Office- Garuwa-Karmatuwa-Karmatiya-Tharuwar at Ghorahi Sub Metropolitian City 09, Dang
Works:
IFB NO : 10-RDDOT/2081/082-030 || Road Safety works on Silgadhi Chaukhutte Road Section, Doti.
Works:
IFB NO : 10-RDDOT/2081/082-029 || Roadside Structure Works along Silgadhi chaukhutte section, Doti.
Works:
IFB NO : 5-NCB/44/081/82 || Integrated Settlement Infrastructure Development Works in Chandrapur Municipality, Rautahat
Works:
IFB NO : WRIDDO/Kapilvastu-02/BelnadiRTW/081-82 || Belnadi River Training Works, Buddhabhumi-08, Kapilvastu
Works:
IFB NO : MRM-20-2081/2082 || Revenue collection of river bed materials of jimkot tallo ghat
Works:
IFB NO : MRM-20-2081/2082 || Revenue collection of river bed materials of jimkot tallo ghat
Works:
IFB NO : WRIDDO/Kapilvastu-02/GudrungRTW/081-82 || Gudrung River Training Works, Buddhabhumi 09, Kapilvastu
Works:
IFB NO : WRIDDO/Kapilvastu-02/GudrungRTW/081-82 || Gudrung River Training Works, Buddhabhumi 09, Kapilvastu
Works:
IFB NO : 10-RDDOT/2081/082-028 || Roadside Structure Works along Seti Highway(Syaule-Silgadhi Section), Doti.
Works:
IFB NO ; FUDBC/Dang/61/2081/82 || Road Upgradation Works at Pakwai Village to East Ghorahi Dharapani Connecting Buddhimarga at Ghorahi Sub-Metropolitian City-06, Dang District
Works:
IFB NO : IDODLK/W/NCB/51/081/082 || (i)Yarsa Tamangtole Sadak Staronnati, Bigu-2, Dolakha, (ii) Bujmane Orang-ghang Thado Khola Mandir jane Sadak Staronnati, Bigu-2 (iii) Mandanda Yarsa Sadak Staronnati, Bigu Ga Pa-2 Orang,Dolakha
Works:
IFB NO : 5-NCB/43/081/82 || Improvement of Road Section (Paurai-Mangalpur-Gairitole-Doban), Chandrapur Municipality, Rautahat
Works:
IFB NO : 5-NCB/43/081/82 || Improvement of Road Section (Paurai-Mangalpur-Gairitole-Doban), Chandrapur Municipality, Rautahat
"
Works:
IFB NO : MRM-19-2081/2082 || Revenue collection of river bed materials of Bhangalo ghat, myagde-2
Works:
IFB NO : 10-RDDOT/2081/082-027 || Roadside Structure along Faltude-Anarkholi Section of Mahakali Highway
Works:
IFB NO : IDODLK/W/NCB/50/081/082 || (i)Gahatebari Banekhola Marbu Sadak Staronnati,Baiteshwor-7 , (ii)Rimal Gaun, GhartiGaun Naagdaha Sadak Staronnati, Baiteshwor,Dolakha (iii) Marbu Rimal Gaun Goretobato Staronnati, Baiteshwor, Dolakha
Works:
IFB NO : 10-RDDOT/2081/082-027 || Roadside Structure along Faltude-Anarkholi Section of Mahakali Highway.
Works:
IFB NO : FUDBC/Dang/58/2081/82 || Upgradation of Road From Katuwa Khola Pul at Ghorahi Sub Metropolitian City 17 along East Bank of River through Katuwa khola Pul of Pyuthan Road to Pul at Ghorahi Sub Metropolitian City 18, Dang District
Works:
IFB NO : FUDBC/Dang/58/2081/82 || Upgradation of Road From Katuwa Khola Pul at Ghorahi Sub Metropolitian City 17 along East Bank of River through Katuwa khola Pul of Pyuthan Road to Pul at Ghorahi Sub Metropolitian City 18, Dang District
Works:
IFB NO : 10-RDDOT/2081/082-026 || Roadway Excavation & Structural Works along Bagarkot Bhageswor Rupal Road, Dadeldhura
Works:
IFB NO : IDODLK/W/NCB/48/081/082 || Balgriha Mahankal Bhagwati Sadak Staronnati, Bhimeshwor-5 ,Dolakha
Works:
IFB NO : 10-RDDOT/2081/082-025 || Improvement Works on Silgadhi chaukhutte section, Doti.
Works:
IFB NO : NEA-KL1-2081/082-MST-02 ||Design, Supply and Delivery of Spare Parts of Nozzle Assemblies of KL1HPS
Works:
IFB NO IDO/CHT/W/NCB/21/081-82 || Construction/Upgrading of 4 different Roads in Rapti-5 Under Package -21
Works:
IFB NO : IDO/CHT/W/NCB/20/081-82 || Construction/Upgrading of 4 different Roads in Rapti-1 Under Package -20
© Copyright Thekkabazar. All Rights Reserved