IFB NO : IFB/04c/UDB-RUP/081-82 || IFB/04c/UDB-RUP/081-82 || Road Construction Works at Simanagar (Gha) path &Simanagar (Na) path ,Maagarghat,Tilottama-3,Rupandehi
IFB NO : BAKUNAPA/NCB/WORKS-05-2081/82 || Construction of Majhkharka Botalkhuti Baukholi Chheda Durumkhola , salleri to Chheda Road and Gobrahi Pravi Field .
IFB NO : BRM/081/82/WORKS/09 || Parthali Primary Hospital Road
IFB NO : BAKUNAPA/NCB/WORKS-04-2081/82 || Construction of Dhorpipal Tatke Rajaikhola Thapachaur Puchhala Road
IFB NO : NCB/BRM/WORKS/007/2081-82 || upgrading of rural road
IFB NO : BAKUNAPA/NCB/WORKS-03-2081/82 || Construction of Kupinde lake Infrastructure
IFB NO : BAKUNAPA/NCB/WORKS-02-2081/082 || Construction of School Building Dipendra Pra. Vi. kauchhe.
IFB NO : NA/19BDE/NCB/WORKS/081/82/04 || Construction of Brigade level office(G+1)
IFB NO : BAKUNAPA/NCB/WORKS-01-2081/82 || Construction of School Building Bheri Aa. Bi. Garha
IFB NO : UGR/NCB/MAN-02/081-82 || The Work consist of Dam construction including with Culvert, Gabion wall and causeway.
IFB NO : UGR/NCB/MAN-01/081-82 || The Work consist of Upgrading of road that includes Stone Masonry wall, Gravelling flexible pavement and Rigid pavement works.
IFB NO : HRM/NCB/W/R/02/081/082 || Construction of Single Cell Box Slab Culvert at harinas Rural Municipality, Birta Ward -06,This road Connect harinas Rural Municipality and Chapakot Municipality,Syangja
IFB NO : PSMUN/NCB/WORKS/2081/082-05 || Ward No 10 Tribeni Chowk Dekhi Shanischare Bazar jane Sadak Kalopatre 2081-82
IFB NO : SGNHC/ICB/081/82/14 || Supply And Delivery Of Vascular Sheath
IFB NO : BRM/081/82/WORKS/08 || Tindobato Patnekhola Bagane Jatrephedi Road
IFB NO : TJVCL/ICB/081-82/EM-HM-01 || Lot 2 Electromechanical and Hydromechanical Works of Upper Trishuli 3B Hydroelectric Project (37 MW)
IFB NO : IFB/04h/UDB-RUP/081-82 || Construction of Ramsamujh samudayik adhuro bhawan nirman,Mayadevi-07,Kapilvastu
IFB NO : NCB/BRM/WORKS/001/2081-82 || Upgrading and maintenance of rural road
IFB NO : MMSI/WORKS/NCB/2081-82/03 || Upgrading Works Of Bhotechaur-Thulopata-Fusromata-Giranchaur-sindhukhola Road.
IFB NO : 10/BM/RD/2081/82 || Rangai gaunko dakshin tol jane sadak,taaku transformer dekhi asaram tharuko ghar hudai jholunge pul sadak and Dubiya tal tol jane adhuro sadak
IFB NO : 9/BM/RD/2081/82 || Badalpura Gaun Dekhi Purba Tol Jane Adhuro Sadak And Badalpura Purvtole Main Bato PCC Dhalan Tatha Nali Nirman
IFB NO : NCB/BRM/WORKS/002/2081-82 || Upgrading of rural road
IFB NO :
BRM/081/82/WORKS/07 Chyasingkharka Health Post Building Construction
Goods Items at Surkhet
IFB NO : PSMUN/NCB/WORKS/2081/082-04 || Pulchowk Bhategauda Sadak kalopatre 2081-82
IFB NO : KRM/NCB/Works/Dolakha/04/2081/82 || Upgrading of katuwa chaur,chihan dada,basnet gaun,loteping,bhatere chaur sadak
IFB NO : 8/BM/RD/2081/82 || Imiliya Ma Vi Hudai Maitahawa Sadak Nirman Buddhabhumu-09
Collection of River Bid Materials at Dailekh
IFB NO : BRM/081/82/WORKS/06 || Bhugdeu Bajar Road
IFB No : DORMEB/33701011/081-82/01 || (Supply Delivery of Transport Truck - 3 units) 2,10,98,230.08
IFB No : DORMEB/33701011/081-82/02 || (Supply and Delivery of Wheel Excavator with Breaker-3 unit) 6,29,61,015.00
IFB NO : 134/65/081-82 || Upgrading of Work
IFB NO : Rmun/NCB/Works/09/2081/82 || Bibhinna Sadak Marmat, Ratuwamai-08
IFB NO : NCB/BRM/WORKS/006/2081-82 || Upgrading of rural road
IFB NO : TJVCL/ICB/081-82/EM-HM-01 || Supply, Installation of Electromechanical plant and Equipment at Kathmandu
IFB NO : IFB/04f/UDB-RUP/081-82 || Construction of Drain from shankarpur to bal bahira,Si.na.pa-10,Rupandehi
IFB NO : Bhjmun/W/NCB/06-2081/82 || Construction of 10 No. Ward Office Building, Bhaisipankha, Bhojpur Municipality-10, Bhojpur
IFB NO : SPRM/NCB/DOP/ WORKS/2081- 082-06 || Nisal Dekhi She Gumba Samma
Paryatan Sadak Nirman 38,53,048.91
IFB NO : SPRM/NCB/DOP/ WORKS/2081- 082-07 || Syungchher Gaun Sichai Kulo Nirman
42,81,421.28
IFB NO : Rmun/NCB/Works/08/2081/82 || Blacktop of Itahara Bajar Purba Katnu Jane sadak
IFB NO : PRM/ILAM/WORK/NCB/02/081/082 ||,Construction Of Veterinary Hospital Building
IFB NO : FRM/Sindhuli/Works/ NCB/05/081-82 || Jhagare Lift Sichai Tatha Nadi
Niyantran Phikkal - 05 (19,325,196.82)
IFB NO : NCB/BRM/WORKS/003/2081-82 || Upgrading of rural road
IFB NO : BRM/081/82/WORKS/05 || Chyamrangbesi Ratankhola Jhinge Sukumphedi Chyangchyang Khola Road
IFB NO : UGR/NCB/MAN- 01/081-82 || Upgrading works of Pratapur 10m Road at Wardno. 6 (1,60,19,704.33)
IFB NO : UGR/NCB/MAN- 02/081-82 || Upgrading of Road Ward no. 4 Twangra Bankariya to Jyamire Dobhan (1,95,57,055.12)
IFB NO : (MBAHS/HH/MI/2081/082-004) || Procurement of Medicine Items for Hospital Pharmacy, MBAHS, Hetauda Hospital
IFB NO : (MBAHSHH/C1/2081/082-005) || Procurement of Cleaning Items for MBAHS Hetauda Hospital
IFB NO : 134/64/081-82 || Upgrading of Work
IFB NO : KLGDWNCB/BIP 04/081/82 || Construction of Barichaur Irrigation Project (Second Package) 41,81,797.40
IFB NO : BGM/REVENUE/ GOODS/1/081-082 || Collection of Local Revenue Tax at Nuwakot
IFB NO : BRM/081/82/WORKS/05 || Chyamrangbesi Ratankhola Jhinge Sukumphedi Chyangchyang Khola Road
IFB NO : KRM/NCB/Works/Dolakha/03/2081/82 || Upgrading of Bhatere chaur,pokhari chaur, loteping sadak dhalan Section 1) thulo khola thulo sim causeway dhalan Section 02) chire khola gabion wall tatha marmat,Thumka pipalbot gabion wall nirman Section 03)
IFB NO : MBAHS/HH/CMGPS/NCB/2081/082- 001 || Supply and Delivery of Central Medical Gas Pipeline System at Makwanpur
© Copyright Thekkabazar. All Rights Reserved